Laserfiche WebLink
<br />Task # 011 <br />Truck/Loader Worksheet Cont'd <br />Page 2 of 3 <br />Truck Bed (volume) Basis: <br />Struck Volume: 10.00 LCY <br />Heaped Volume: 12.00 LCY <br />Average Volume: 11.00 LCY <br />Adjusted Volume: 12.00 LCY <br />Final Truck Volume Based on Number of Loader Passes: 10.73 LCY <br />Loading Tool Capacity <br />Bucket Size Class: NA <br />Rated Capacity: 5.500 LCY (heaped) <br />regates to 1/8" (95-100% <br />ose material - uniform ag <br />L <br />) 0.975 <br />Bucket Fill Factor: 0.975 g <br />o <br />Adjusted Capacity: 5.363 LCY <br />Site Altitude (ft.): 5320 feet <br />Job Condition Corrections: <br /> Source <br /> Truck Loader <br />Aii de Adj: 1.000 0.920 (CAT HB) <br />Job cienc y: 0.830 0.830 (CAT HB) <br />Net Correction: 0.830 0.764 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: 2 passes <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders - Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.575 minutes <br /> Factor (min.) Source <br />Cycle Time Factors <br />Material: <br />0.020 <br />Material u to 1/8" diameter 0.02 <br />00 <br />(Cat HB) <br />(Cat HB) <br />Stockpile: Conve or or dozer piled M ' hi hand u 0.00 0.0 <br />040 <br />0 (Cat HB <br />Truck Ownershi : . <br />Common ownershi of trucks and loaders -0.04 - <br />040 <br />-0 C <br />( at HB) <br />Operation: . <br />Constant operation -0.04 <br />000 <br />0 (Cat HB) <br />Dump Target: <br />. <br />Nominal target 0.00 <br />060 <br />-0 <br />t <br />minutes <br /> . <br />: <br />Net Cycle Time Adjustmen <br />Adjusted Loader Cycle Time: 0.515 minutes <br />Net Load Time per Truck: 0.615 minutes <br />Truck Cycle Time: <br />Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br />Truck Load Time: 0.615 Minutes Adjusted for site altitude: 0.668 Minutes <br />Truck Maneuver and Dump Time: 0.90 Minutes Adjusted for site altitude: 0.900 Minutes <br />Truck Travel (Haul & Return) Time: Road Condition: Rutted dirt little maintenance no water I" tire <br />penetration 4.0 <br />CIRCES Cost Estimating Software