Laserfiche WebLink
Page 1 of 3 <br />TRUCK/LOADER TEAM WORK <br />Site <br />Task description: <br />Chambers Pit <br />-Transport topsoil from Glen Pit stockpile <br />Permit Action: 2011 Midterm Review Permit/Job#: M1979205 <br />PROJECT IDENTIFICATION <br />Task #: 011 State: <br />Date: 4/13/2011 County: <br />User: DMC <br />Colorado <br />Garfield <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Shift basis: 1 er da <br />E ui ment Description <br />ck Loader Team -Truck: <br />T Generic 10-12 cy, 6x4 <br />ru <br />-Loader: CAT 972G (2002) <br />ment -Load Area: <br />ui <br />t E <br />S NA <br />p <br />q <br />uppor <br />-Dump Area: NA <br />nance -Motor Grader: <br />t <br />i <br />d M NA <br />n <br />e <br />a <br />Roa <br />-Water Truck: NA <br />Cost Breakdown: Truck/Loader Team <br />Truck Loader Su ort E ui ment <br />Load Area Dump Area Maintenance E ui me <br />Motor Grader Water Tn <br />hi 100 100 NA NA NA NA <br />ne: <br />%Utilization-mac <br />cost/hour: <br />hi <br />$12.25 <br />$27.23 <br /> <br />NA <br /> <br />NA <br /> <br />NA NA <br />p <br />Owners <br />Operating costihour: <br />st/hour: $49.41 <br /> <br />NA $51.19 <br /> <br />$0.00 NA <br /> <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. co <br />t/hour: <br />00 <br />$0 <br />$38.49 <br />NA <br />NA <br />NA NA <br />Operator cos <br />it Subtotals: <br />U . <br />$61.66 $116.91 NA NA NA NA <br />n <br />it <br />f U <br />2 <br />1 <br />0 <br />0 <br />0 0 <br />n <br />s: <br />Number o <br />Subtotals: <br />G Work: $240.23 Support: $0.00 Maint: $0.00 <br />roup <br />Total work team c ost/hour: $240.23 <br />MATERIAL QUANTITIES <br />Initial volume: 3,500 CCY Swell factor: 1.000 <br />Loose volume: 3,500 LCY <br />Source of estimated volume: Onsite observation <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 1,600 Pounds/LCY <br />Description: Top Soil <br />Rated Payload: 35,400 Pounds <br />Payload Capacity: 22.13 LCY <br />Abbreviation: None <br />Filename: M205-011 <br />CIRCES Cost Estimating Software