Laserfiche WebLink
Task # 011 Page 3 of 3 <br />Truck/Loader Worksheet Cont'd <br />Haul Rout <br />Seg # e: <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />elocity Travel <br />Time <br /> (Ft) N (/O) min <br />1 5280.00 0.00 4.00 4.00 2665 2.079 <br />Haul Time: <br /> Return Time: 1.879 minutes <br /> Total Truck Cycle Time: 6.026 minutes <br />Loading Tool unit <br />Production <br />550.72 LCY/Hour Adjusted for job efficiency: <br />457.09 LCY/Hour <br />Truck Unit Production <br />106.78 LCY/Hour Adjusted for job efficiency: <br />88.63 LCY/Hour <br />Optimal No. of Trucks: 5 Truck(s) Selected Number of Trucks: 2 Truck(s <br /> Adjusted hourly truck team production: 177.25 LCY/Hour <br /> Adjusted single truck/loader team production: 177.25 LCY/Hour <br /> le truck/loader team production: 177.25 <br />d multi <br />t <br />Ad LCY/Hour <br /> p <br />e <br />jus <br />JOB TIME AND COST <br />Fleet size: 1 <br />Unit cost: $1.355 <br />2.079 <br />III lllutGa <br />Zeturn Route: Velocity Travel <br />ieg # Haul Distance Grade (%) Roll. Res Total Res Time <br />(Ft) (%) (%) (fpm) min <br />5280.00 0.00 4.00 4.00 2849 1.879 <br />Team(s) Total job time: 19.75 Hours <br />/LCY Total job cost: $4,743.54 <br />CIRCES Cost Estimating Software