Laserfiche WebLink
Page 2 of 4 <br />New Application, Cost Summary <br />, -. <br />r 7, <o DO <br />! I ^ MINING� Colorado Division of Reclamation, Mining and Safety <br />fAffTY <br />Reclamation Cost Summary <br />Permit No. <br />C- 2009 -087 <br />Prepared by: JHB <br />Date: <br />5/5/2010 <br />Mine name: <br />Peabody Sage Creek <br />Permit or job action: <br />County: <br />Routt <br />TASK LIST (DIRECT <br />COSTS) <br />Permit Application <br />100% <br />0.00 <br />$0 <br />6 Rip Haulroad A reduction <br />ripper <br />5.77 <br />$1,195 <br />100% <br />5.77 <br />$1,195 <br />7 Regrade haulroad A reduction <br />dozer <br />39.03 <br />$15,737 <br />100% <br />39.03 <br />$15,737 <br />11 Rip Haulroad A -1 Reduction <br />ripper <br />2.89 <br />$599 <br />100% <br />2.89 <br />$599 <br />12 regrade haulroad A -1 reduction <br />dozer <br />45.57 <br />$9,186 <br />100% <br />45.57 <br />$9,186 <br />13 replace topsoil on reduced portion of Haulroad A -1 <br />1 <br />3.89 <br />$3,504 <br />100% <br />3.89 <br />$3,504 <br />17 Rip Haul road A -2 removal <br />ripper <br />3.81 <br />$789 <br />100% <br />3.81 <br />$789 <br />18 regrade Hauroad A -2 removal <br />dozer <br />53.78 <br />$10,843 <br />100% <br />53.78 <br />$10,843 <br />19 replace topsoil on reduced portion of Haulroad A -2 <br />scraperl <br />3.79 <br />$3,405 <br />100% <br />3.79 <br />$3,405 <br />23 Rip Haulroad B reduction <br />ripper <br />4.66 <br />$966 <br />100% <br />4.66 <br />$966 <br />24 regrade Haulroad B reduction <br />dozer <br />53.39 <br />$10,763 <br />100% <br />53.39 <br />$10,763 <br />28 Rip Haulroad B -1 reduction <br />ripper <br />1.74 <br />$360 <br />100% <br />1.74 <br />$360 <br />29 Regrade haulroad B -1 reduction <br />dozer <br />20.55 <br />$4,143 <br />100% <br />20.55 <br />$4,143 <br />30 Replace topsoil on Haulroad B -1 <br />scraperl <br />2.16 <br />$1,944 <br />100% <br />2.16 <br />$1,944 <br />40 Rip haulroad C reduction <br />ripper <br />2.17 <br />$448 <br />100% <br />2.17 <br />$448 <br />41 Regrade Haulroad C reduction <br />dozer <br />23.47 <br />$4,731 <br />100% <br />23.47 <br />$4,731 <br />42 Replace topsoil on Haulroad C Reduction <br />scraperl <br />1.73 <br />$1,559 <br />100% <br />1.73 <br />$1,559 <br />46 rip Haulroad D removal <br />ripper <br />2.18 <br />$452 <br />100% <br />2.18 <br />$452 <br />47 Regrade Haulroad D removal <br />dozer <br />28.19 <br />$5,683 <br />100% <br />28.19 <br />$5,683 <br />48 Replace topsoil on Haulroad D removal <br />scraperl <br />2.03 <br />$1,830 <br />100% <br />2.03 <br />$1,830 <br />50 reseed reclaimed roads <br />revege <br />16.00 <br />$18,293 <br />100% <br />16.00 <br />$18,293 <br />78 Seal 4 Water wells <br />excel <br />13.11 <br />$10,600 <br />100% <br />13.11 <br />$10,600 <br />79 Backfill UCSS sump <br />dozer <br />4.25 <br />$1,096 <br />100% <br />4.25 <br />$1,096 <br />80 backfll LCSS sump <br />dozer <br />12.76 <br />$3,293 <br />100% <br />12.76 <br />$3,293 <br />81 Clean sediment form UCSS & LCSS disose @ Foidel Creek Refuse pile <br />truck <br />62.33 <br />$34,350 <br />100% <br />62.33 <br />$34,350 <br />100% <br />0.00 <br />$0 <br />Liability transferred from Seneca It Mine <br />64 Pre -law area remaining 68.79 acres BRB1 <br />89 BR62 310.21 ac Phase II released <br />100% <br />0.00 <br />$0 <br />Sum2 <br />1.00 <br />$285,484 <br />100% <br />1.00 <br />$285,484 <br />revege <br />155.11 <br />$231,054 <br />100% <br />155.11 <br />$231,054 <br />90 BRB3 851.81 ac Phase II released (Acres remaining in Seneca II permit remc <br />revege <br />212.95 <br />$634,455 <br />100% <br />212.95 <br />$634,455 <br />91 BR64 448.25 ac Phase II released (Acres remaining in Seneca II permit remo <br />revege <br />112.06 <br />$333,871 <br />100% <br />112.06 <br />$333,871 <br />92 pond maintenance; clean sediment from Pecoco, 004 & 003 <br />truck <br />4.73 <br />$2,619 <br />100% <br />4.73 <br />$2,619 <br />Subtotal - this page <br />2287.16 <br />$1,633,252 <br />