<br />Reclamation Cost Summary
<br />Permit No.
<br />C- 2009 -087
<br />Prepared by: JHB
<br />Date:
<br />5/5/2010
<br />Mine name:
<br />Peabody Sage Creek
<br />Permit or job action:
<br />County:
<br />Routt
<br />TASK LIST (DIRECT
<br />COSTS)
<br />Permit Application
<br />100%
<br />0.00
<br />$0
<br />6 Rip Haulroad A reduction
<br />ripper
<br />5.77
<br />$1,195
<br />100%
<br />5.77
<br />$1,195
<br />7 Regrade haulroad A reduction
<br />dozer
<br />39.03
<br />$15,737
<br />100%
<br />39.03
<br />$15,737
<br />11 Rip Haulroad A -1 Reduction
<br />ripper
<br />2.89
<br />$599
<br />100%
<br />2.89
<br />$599
<br />12 regrade haulroad A -1 reduction
<br />dozer
<br />45.57
<br />$9,186
<br />100%
<br />45.57
<br />$9,186
<br />13 replace topsoil on reduced portion of Haulroad A -1
<br />1
<br />3.89
<br />$3,504
<br />100%
<br />3.89
<br />$3,504
<br />17 Rip Haul road A -2 removal
<br />ripper
<br />3.81
<br />$789
<br />100%
<br />3.81
<br />$789
<br />18 regrade Hauroad A -2 removal
<br />dozer
<br />53.78
<br />$10,843
<br />100%
<br />53.78
<br />$10,843
<br />19 replace topsoil on reduced portion of Haulroad A -2
<br />scraperl
<br />3.79
<br />$3,405
<br />100%
<br />3.79
<br />$3,405
<br />23 Rip Haulroad B reduction
<br />ripper
<br />4.66
<br />$966
<br />100%
<br />4.66
<br />$966
<br />24 regrade Haulroad B reduction
<br />dozer
<br />53.39
<br />$10,763
<br />100%
<br />53.39
<br />$10,763
<br />28 Rip Haulroad B -1 reduction
<br />ripper
<br />1.74
<br />$360
<br />100%
<br />1.74
<br />$360
<br />29 Regrade haulroad B -1 reduction
<br />dozer
<br />20.55
<br />$4,143
<br />100%
<br />20.55
<br />$4,143
<br />30 Replace topsoil on Haulroad B -1
<br />scraperl
<br />2.16
<br />$1,944
<br />100%
<br />2.16
<br />$1,944
<br />40 Rip haulroad C reduction
<br />ripper
<br />2.17
<br />$448
<br />100%
<br />2.17
<br />$448
<br />41 Regrade Haulroad C reduction
<br />dozer
<br />23.47
<br />$4,731
<br />100%
<br />23.47
<br />$4,731
<br />42 Replace topsoil on Haulroad C Reduction
<br />scraperl
<br />1.73
<br />$1,559
<br />100%
<br />1.73
<br />$1,559
<br />46 rip Haulroad D removal
<br />ripper
<br />2.18
<br />$452
<br />100%
<br />2.18
<br />$452
<br />47 Regrade Haulroad D removal
<br />dozer
<br />28.19
<br />$5,683
<br />100%
<br />28.19
<br />$5,683
<br />48 Replace topsoil on Haulroad D removal
<br />scraperl
<br />2.03
<br />$1,830
<br />100%
<br />2.03
<br />$1,830
<br />50 reseed reclaimed roads
<br />revege
<br />16.00
<br />$18,293
<br />100%
<br />16.00
<br />$18,293
<br />78 Seal 4 Water wells
<br />excel
<br />13.11
<br />$10,600
<br />100%
<br />13.11
<br />$10,600
<br />79 Backfill UCSS sump
<br />dozer
<br />4.25
<br />$1,096
<br />100%
<br />4.25
<br />$1,096
<br />80 backfll LCSS sump
<br />dozer
<br />12.76
<br />$3,293
<br />100%
<br />12.76
<br />$3,293
<br />81 Clean sediment form UCSS & LCSS disose @ Foidel Creek Refuse pile
<br />truck
<br />62.33
<br />$34,350
<br />100%
<br />62.33
<br />$34,350
<br />100%
<br />0.00
<br />$0
<br />Liability transferred from Seneca It Mine
<br />64 Pre -law area remaining 68.79 acres BRB1
<br />89 BR62 310.21 ac Phase II released
<br />100%
<br />0.00
<br />$0
<br />Sum2
<br />1.00
<br />$285,484
<br />100%
<br />1.00
<br />$285,484
<br />revege
<br />155.11
<br />$231,054
<br />100%
<br />155.11
<br />$231,054
<br />90 BRB3 851.81 ac Phase II released (Acres remaining in Seneca II permit remc
<br />revege
<br />212.95
<br />$634,455
<br />100%
<br />212.95
<br />$634,455
<br />91 BR64 448.25 ac Phase II released (Acres remaining in Seneca II permit remo
<br />revege
<br />112.06
<br />$333,871
<br />100%
<br />112.06
<br />$333,871
<br />92 pond maintenance; clean sediment from Pecoco, 004 & 003
<br />truck
<br />4.73
<br />$2,619
<br />100%
<br />4.73
<br />$2,619
<br />Subtotal - this page
<br />2287.16
<br />$1,633,252