My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-21_PERMIT FILE - C2009087A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087A
>
2011-03-21_PERMIT FILE - C2009087A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:54 PM
Creation date
4/14/2011 9:48:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087A
IBM Index Class Name
Permit File
Doc Date
3/21/2011
Doc Name
Estimated Reclamation Cost
Section_Exhibit Name
Exhibit 3.02.2-E1 Estimated Reclamation Cost
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 4 <br />New Application, Cost Summary <br />-' <br />Colorado Division of Reclamation, Mining and Safety <br />Reclamation Cost Summary <br />Permit No. <br />C- 2009 -087 <br />Prepared by: JHB <br />Date: <br />5/5/2010 <br />Mine name: <br />Peabody Sage Creek <br />Permit or job action: <br />County: <br />Routt <br />TASK LIST (DIRECT <br />COSTS) <br />Permit Application <br />69 rill & gully repair & site maintenance over liability period <br />excel <br />440.00 <br />$73,181 <br />100% <br />440.00 <br />$73,181 <br />95 mob /demob <br />mob <br />3.14 <br />$20,993 <br />100% <br />3.14 <br />$20,993 <br />93 water monitoring over 10 year liability <br />excel <br />500.00 <br />$106,900 <br />100% <br />500.00 <br />$106,900 <br />94 Weed management over 10 year liability (task 111 for SII SL4) <br />excel <br />17.00 <br />$5,492 <br />100% <br />17.00 <br />$5,492 <br />76 Seal monitoring wells <br />excel <br />74.41 <br />$46,688 <br />100% <br />74.41 <br />j $46,688 <br />77 Seal Portal openings <br />Ugopen <br />32.00 <br />$20,928 <br />100% <br />32.00 <br />$20,928 <br />82 Regrade Landfill area <br />dozer <br />323.20 <br />$84,527 <br />100% <br />323.20 <br />$84,527 <br />83 finish grade landfill area <br />grader <br />2.31 <br />$268 <br />100% <br />2.31 <br />$268 <br />84 regrade ditches <br />grader <br />40.00 <br />$4,653 <br />100% <br />40.00 <br />$4,653 <br />85 Backfill Truck Wash Ponds at North Facilities Area <br />dozer <br />8.60 <br />$2,094 <br />100% <br />8.60 <br />$2,094 <br />86 Excavate Post - mining Drainage Channel 12A <br />excavatel <br />7.33 <br />$716 <br />100% <br />7.33 <br />$716 <br />88 stabililize Post - mining drainage 12A <br />excel <br />40.00 <br />$7,307 <br />100% <br />40.00 <br />$7,307 <br />100% <br />0.00 <br />$0 <br />total task hours= <br />3482.80 <br />Subtotal - this page <br />95.9311 <br />$373,746 <br />Grand total all areas = <br />3482.8011 <br />$4,503,852 <br />
The URL can be used to link to this page
Your browser does not support the video tag.