Laserfiche WebLink
Page 1 of 4 <br />New Application, Cost Summary <br />oO,yeoaoo <br />, Colorado Division of Reclamation, Mining and Safety <br />.Il'd SAFETY <br />Reclamation Cost Summary <br />Permit No. <br />C- 2009 -087 <br />Prepared by: JHB <br />Date: <br />5/5/2010 <br />Mine name: <br />Peabody Sage Creek <br />Permit or job action: <br />County: <br />Routt <br />TASK LIST (DIRECT <br />COSTS) <br />Permit Application <br />New Task <br />no. <br />Task description <br />Form <br />Used <br />Task <br />Hours <br />(100% <br />Liability) <br />Direct <br />, <br />Cost (100% <br />Liability) <br />% Liability <br />Remaining <br />Task Hours <br />(Actual <br />Liability) <br />Direct Cost <br />(Actual <br />Liability) <br />North Surface <br />Facilities Area <br />3 <br />Demolition and disposal of North Facilities and Sturctures <br />excel <br />130.00 <br />$589,796 <br />100% <br />130.00 <br />$589,796 <br />65 Remove gravel from North facilities parking lot <br />truck <br />6.45 <br />$7,468 <br />100% <br />6.45 <br />$7,468 <br />66 Rip North Facilities parking lot <br />ripper <br />3.24 <br />$842 <br />100% <br />3.24 <br />$842 <br />67 Remove gravel from main North facilities area <br />truck <br />15.61 <br />$18,027 <br />100% <br />15.61 <br />$18,027 <br />68 Rip 6.0 acres North Facilities area <br />ripper <br />1 7.48 <br />$1,944 <br />100% <br />7.48 <br />$1,944 <br />70 Remove gravel from 1.6 acre North facilities electrical shop area <br />truck <br />4.20 <br />$4,852 <br />100% <br />4.20 <br />$4,852 <br />71 Rip 1.6 acre North facilities electrical shop area <br />rpper <br />2.00 <br />$518 <br />100% <br />2.00 <br />$518 <br />72 Remove gravel from 0.3 acre North Facilities Office area <br />truck <br />0.82 <br />$949 <br />100% <br />0.82 <br />$949 <br />73 Rip 0.3 area North facilities office area <br />ripper <br />0.37 <br />$97 <br />100% <br />0.37 <br />$97 <br />75 Reseed North facilities areas <br />revege <br />10.60 <br />$44,756 <br />100% <br />10.60 <br />$44,756 <br />100% <br />0.00 <br />$0 <br />South Surface Facilities Area <br />100% <br />0.00 <br />$0 <br />2 Demolition and disposal of South Facilities Structures <br />excel <br />180.00 <br />$796,278 <br />100% <br />180.00 <br />$796,278 <br />51 Remove Coal Stockpile footprint, haul to Foidel Creek Mine <br />truck <br />14.20 <br />$40,555 <br />100% <br />14.20 <br />$40,555 <br />52 Haul backfill material from coal handling facility to portal face -up <br />truck <br />253.89 <br />$322,390 <br />100% <br />253.89 <br />$322,390 <br />53 Haul backfill material from utility pad area to portal face -up <br />truck <br />110.46 <br />$192,372 <br />100% <br />110.46 <br />$192,372 <br />54 Haul backfill material from South Facilities pad to portal face -up <br />truck <br />192.27 <br />$293,623 <br />100% <br />192.27 <br />$293,623 <br />55 Haul backfill material from explosives storage pad to portal face -up <br />truck <br />58.88 <br />$90,754 <br />100% <br />58.88 <br />$90,754 <br />56 push backfill material from facilities W of ramp to portal face -up <br />dozer <br />16.66 <br />$8,601 <br />100% <br />16.66 <br />$8,601 <br />57 replace topsoil on Coal Handling facilites area <br />1 <br />19.05 <br />$15,181 <br />100% <br />19.05 <br />$15,181 <br />58 Replace topsoil on Portal face -ip footprint <br />scraped <br />22.27 <br />$17,742 <br />100% <br />22.27 <br />$17,742 <br />59 Replace topsoil on 0.33 ac. Facilities W of ramp <br />scraper1 <br />0.72 <br />$574 <br />100% <br />0.72 <br />$574 <br />60 Replace topsoil on 4.79 ac. Utility Pad <br />1 <br />10.18 <br />$8,115 <br />100% <br />10.18 <br />$8,115 <br />61 Replace topsoil on 5.04 ac. South Facilities Storage area <br />1 <br />9.42 <br />$7,506 <br />100% <br />9.42 <br />$7,506 <br />62 Replace topsoil on 1.5 ac. Explosives Storage Area <br />scraper1 <br />4.19 <br />$3,342 <br />100% <br />4.19 <br />$3,342 <br />63 Reseed South Facilities Area <br />revege <br />26.75 <br />$30,572 <br />100% <br />26.75 <br />$30,572 <br />Subtotal - this page <br />1 1099.7111 <br />$2,496,854 <br />