Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 0IA Page 3 of 3 <br />Haul Route: <br />Seg # Haul Distance Grade (%) Roll. Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br />1 26400.00 0.00 2.00 2.00 2868 9.350 <br />Haul Time: 9.350 minutes <br />Return Route: <br />Seg # Haul Distance Grade (%) Roll. Res Total Res Velocity Travel <br /> (Ft) (fpm) Time <br /> min <br />1 26400.00 0.00 2.00 2.00 2905 9.123 <br /> Return Time: 9.123 minutes <br /> Total Truck Cycle Time: 21.608 minutes <br />Loading Tool unit <br />Production 451.01 LCY/Hour Adjusted for job efficiency: 374.34 LCY/Hour <br />Truck Unit Production <br /> 46.65 LCY/Hour Adjusted for job efficiency: 38.72 LCY/Hour <br />Optimal No. of Trucks: 10 Truck(s) Selected Number of Trucks: 9 Truck(s) <br /> Adjusted hourly truck team production: 348.47 LCY/Hour <br /> Adjusted single truck/loader team production: 348.47 LCY/Hour <br /> Adjusted multiple truck/loader team production: 696.94 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) <br />Unit cost: $3.246 /LCY <br />Total job time: 251.10 Hours <br />Total job cost: $568,066.74 <br />CIRCES Cost Estimating Software