My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-04_INSPECTION - M2000032
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2000032
>
2011-04-04_INSPECTION - M2000032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:21 PM
Creation date
4/13/2011 1:54:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000032
IBM Index Class Name
INSPECTION
Doc Date
4/4/2011
Doc Name
Inspection report
From
DRMS
To
MA Concrete Construction, Inc.
Inspection Date
3/24/2011
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />SCRAPER TEAM WORK <br />Task description: Remove Road and Facilities Area Gravel Surface <br />Site: Monument View Gravel Pit Permit Action: SI-01 <br />PROJECT IDENTIFICATION <br />Task #: 02A State: Colorado <br />Date: 3/31/2011 County: Mesa <br />User: THM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />COSTShift basis: 1 per day <br />-Scraper: Cat 637G w/push-pull <br />-Dozer: Cat D8R Series II - 8SU (2005) <br />Permit/Job#: M2000032 <br />Abbreviation: None <br />Filename: M032-02a <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance -Motor Grader: NA <br />-Water Truck: NA <br />Cost Breakdown: Scraner Work Team Sunnort Fouinment Maintenance Fnninment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 50 NA NA NA NA <br />Ownership cost/hour: $91.74 $39.08 NA NA NA NA <br />Operating cost/hour: $202.41 $43.55 NA NA NA NA <br />Ripper op. cost/hour: NA $0.00 NA NA NA NA <br />Operator cost/hour: $38.67 $38.49 NA NA NA NA <br />Unit Subtotals: $332.82 $121.12 NA NA NA NA <br />Number of Units: 2 1 0 0 0 0 <br />Group Subtotals: Work: $786.76 Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $786.76 <br />MATERIAL QUANTITIES <br />Initial volume: 8,873 CCY Swell factor: 1.060 <br />Loose volume: 9,405 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraner Bowl (volume) Basis: <br />Material weight: 2,850 lbs/LCY <br />Material description: Gravel - Dry (1/4""-2""diam.) <br />Rated Payload: 75,000 pounds <br />Payload Capacity: 26.32 LCY <br />Struck Volume: 24.00 LCY <br />Heaped Volume: 34.00 LCY <br />Average Volume: 29.00 LCY <br />Adjusted Capacity: 26.32 LCY <br />CIRCES Cost Estimating Software
The URL can be used to link to this page
Your browser does not support the video tag.