Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # O 1 A Page 2 of 3 <br />Truck Bed (volume) Basis: <br />Struck Volume: 12.00 LCY <br />Heaped Volume: 18.00 LCY <br />Average Volume: 15.00 LCY <br />Adjusted Volume: 18.00 LCY <br />Final Truck Volume Based on Number of Loader Passes: 16.80 LCY <br />Loading; Tool Capacity <br />Bucket Size Class: NA <br />Rated Capacity: 4.800 LCY (heaped) <br />Bucket Fill Factor: 0.875 Loose material - 1" and over (85 - 90% 0.875 <br />Adjusted Capacity: 4.200 LCY <br />Job Condition Corrections: Site Altitude (ft.): 4550 feet <br /> Truck Loader Source <br />Altitude Adj: 1.000 1.000 (CAT HB) <br />Job Efficiency: 0.830 0.830 (CAT HB) <br />Net Correction: ' 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders - Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.575 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material: Material 3/4" to 6" diameter 0.00 0.000 (Cat HB) <br />Stockpile: Conveyor or dozer piled 10 ft. high and u 0.00 0.000 (Cat HB) <br />Truck Ownershi : Common ownership of trucks and loaders -0.04 -0.040 (Cat HB) <br />Operation: Constant operation -0.04 -0.040 (Cat HB) <br />Dump Target: Fragile target 0.05 0.050 (Cat HB) <br /> Net Cycle Time Adjustment: -0.030 minutes <br /> Adjusted Loader Cycle Time: 0.545 minutes <br /> Net Load Time per Truck: 1.735 minutes <br />Truck Cycle Time: <br />Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br />Truck Load Time: 1.735 Minutes Adjusted for site altitude: 1.735 Minutes <br />Truck Maneuver and Dump Time: 0.90 Minutes Adjusted for site altitude: 0.900 Minutes <br />Truck Travel (Haul & Return) Time: Road Condition: Hard, smooth, stabilized, surfaced, watered, <br />maintained 2.0 <br />passes <br />4 <br />CIRCES Cost Estimating Software