Laserfiche WebLink
Page 1 of 3 <br />TRUCK/LOADER TEAM WORK <br />Task description: Import fill to backfill 6 acre pit (not inc. on-site fill) <br />Site: Monument View Gravel Pit Permit Action: SI-01 Permit/Job#: M2000032 <br />PROJECT IDENTIFICATION <br />Task #: O1 A State: Colorado <br />Date: 3/30/2011 County: Mesa <br />User: THM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Abbreviation: None <br />Filename: M032-01a <br />Shift basis: 1 per day <br />Truck Loader Team -Truck: Generic 12-18 cy, 6x4 <br />-Loader: CAT 966G (2002) <br />Support Equipment -Load Area: CAT 966G (2002) <br />-Dump Area: CAT 826G Series II (2005) <br />Road Maintenance -Motor. Grader: NA <br />-Water Truck: NA <br />Cost Breakdown: Truck/Loader Team Sunnort Fauinment Maintenances Frniinmant <br /> Truck Loader Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 100 100 100 NA NA <br />Ownership cost/hour: $14.72 $27.48 $27.48 $56.67 NA NA <br />Operating cost/hour: $54.95 $46.49 $46.49 $122.31 NA NA <br />Ripper op. cost/hour: NA $0.00 $0.00 $0.00 NA NA <br />Operator cost/hour: $25.19 $38.49 $38.49 $38.49 NA NA <br />Unit Subtotals: $94.86 $112.46 $112.46 $217.48 NA NA <br />Number of Units: 18 2 1 1 0 0 <br />Group Subtotals: Work: $1,932.40 Support: $329.94 Maint: $0.00 <br />Total work team cost/hour: $2,262.34 <br />MATERIAL OUANTITIES <br />Initial volume: 175,000 CCY Swell factor: 1.000 <br />Loose volume: 175,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,700 Pounds/LCY <br />Description: Sand and clay - Loose <br />Rated Payload: 50,300 Pounds <br />Payload Capacity: 18.63 LCY <br />CIRCES Cost Estimating Software