My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-14_REVISION - M1977493 (41)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-14_REVISION - M1977493 (41)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:18 PM
Creation date
4/6/2011 8:43:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/14/2011
Doc Name
Exhibit List, Exs. 17 & 18
From
Climax
To
MLRB
Type & Sequence
AM6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />t <br />71 <br /> <br />it ';"r <br />CM0000903 <br />d. Preparing a memorandum which defines project <br />yield and the demands by the project <br />participants, describes the operations model, <br />presents the results of the model runs, and <br />presents the alternative configurations, <br />including delivery options and potential <br />delivery limitations. <br />2. Technical feasibility and cost. In general, this <br />portion of the study will include construction <br />cost estimates of project components and various <br />configurations at a reconnaissance grade level. <br />This means that the studies would be conducted <br />using available information and site <br />reconnaissance. Drilling, materials testing and <br />other more intensive efforts are not included at <br />this level. <br />Specifically, the technical feasibility/cost <br />estimate will include: <br />[[a a. Compiling geological maps, reports and other <br />^l.? documents with information relevant to the <br />site selection of storage and diversion dams, <br />,}} pumping plants and pipeline.corridors. <br />b. Reconnoitering the project area, the <br />reservoir sites and pipeline corridors <br />t;h identified to date by a geologist or <br />geotechnical engineer and design engineer. <br />d. Recognizing and describing any fatal flaws or <br />structural conditions that would inhibit the <br />construction of a project component. <br />. J aMM <br />am -n w = <br />v <br />r <br />N <br />cn - <br />• to e? <br />o °D.. <br />a? <br />®m? <br />z w- <br />C9 W <br />C9 "0= <br />M aMEN <br />C <br />n ? <br />• <br />e. Preparing a memorandum which describes the <br />investigations and presents the cost. <br />estimates for the project components and <br />s:\1ega1\mtp\water\aur-cs2.mou 3 1111111 IN 111111111111111111111111111116 <br />666203 08/17/1998 0- --- 23 Sara Fisher <br />24 of 112 R 561.00 D 0.00 K0.00 Eagle CO <br />3?Y - <br />C. Preparing reconnaissance level designs and <br />construction cost estimates of the project <br />components and configurations. Multiple <br />estimates for a given component may be needed <br />depending on the capacity of a given <br />configuration.
The URL can be used to link to this page
Your browser does not support the video tag.