Laserfiche WebLink
Permit Amendment (AM-e6) - Climax Mine <br />CM0000696 <br />CLIMAX MINE RECLAMATION COST ESTIMATE <br />Financial Reporting Unit Rates <br />Interceptors - decommission only <br />Assumptions: <br />(1) Interceptors will no longer be needed at the close of the mine. <br />(2) Interceptor ditches and canals can be graded out and revegetated using Conventional reclamation equipment <br />(3) No topsoil or growth media other than graded materials will be required to support vegetation. <br />(4) Revegetation work is covered elsewhere. <br />(5) Open Pit Interceptors are needed for both 2010 and AM08 scenarios. <br />Tasks: <br />(1) Pull cut slope down into interceptor ditch with excavator and <br />(2) grade out with dozer to conform with surrounding topography. <br />Timing <br />2011+ <br />Total Cost <br />$183,818 <br />Calculations <br />Ir iiial 'Swell P f t o , ' - C-uu, it Coat/Unlt Total I.ahor Coal/Unit Totnl <br />Tns Mlkree y of Eq Ip Volume .Factor Qty Un is n Unto Hr, fieq V - Equip- °tal Equip Coat - Lebor Cost Mate ri ala Mate rlnl Total Coat <br /> <br />Pull cut slope into ditch <br />330 Excavator <br />Chalk Mtn. Interceptor 50,000 cy 300 cyll r 166.67 $129.16 $21,526 $30.21 $5.035 $26,561 <br />East Interceptor (E Dump/McNulty/Hwy 91) 22,222 cy 300 cy/hr 74.07 $129.16 $9,567 $30.21 $2,238 $11,605 <br />East Interceptor (Hwy 91 to Clinton) 34,722 cy 300 cy/hr 115.74 $129.16 $14,949 $30.21 $3,496 $18,445 <br />West Interceptor (Sheep Mtn to Searle Cr) 37,500 cy 300 cy/hr 125.00 $129.16 $16,144 $30.21 $3,776 $19,921 <br />West Interceptor (Searle Cr to Tucker Cr) 44,444 cy 300 cy/hr 148.15 $129.16 $19,134 $30.21 $4,475 $23,610 <br />Open Pit North Channel Interceptor 16,111 cy 300 cy/hr 53.70 $129.16 $6,936 $30.21 $1,622 $8,559 <br />Open Pit South Channel Interceptor 18,333 cy 300 cy/hr 61,11 $129.16 $7,893 $30.21 $1,846 $9,739 <br />Upper North Interceptor 16,667 cy 300 cyRv 55.56 $129.16 $7,175 $30.21 $1,678 $8,854 <br />Lower North Interceptor 5,556 cy 300 cylhr 18.52 $129.16 $2,392 $30.21 $559 $2,951 <br />Grade surface <br />D6 Dozer <br />Grade disturbance 8 blend Coy surrounding 121.76 acres 2 hrs/ac 243.53 $103.24 $25,142 $33.81 $8,232 $33,374 <br />?? - 11'- _Hf v?,?l loin FquF? bti Total F f;os'. lo'dl h'a a'C- TCt.+I'o?1 <br />TOTAL:COSTS 1,062 ' . " $ -' 130,858 ; 32,959 S - 5 163,818 .. 1* 0." <br />0