Laserfiche WebLink
• <br />P.-xm.mm.,s Nratrsl-Com.r Mw <br />CM0000695 <br />CLIMAX MINE RECLAMATION COST ESTIMATE <br />Flnanclal Reoortina Unit Rates <br />6 Dam <br />GAssumptions: <br />Tasks: <br />Cover future raise with 24" overburden, 6" subsoil, and 6" topso9 per HMI Soil Ouenblies spre adsheet Feb-2010 and AM06 Exhiblt E text. <br />Timing <br />End of Mine Life <br />Total Cost <br />$961,643 <br />Calculations <br />Inial <br />' Cost'U,t Cast0- Tol ILabor 'C, l1 rt T-1M t n.l ? <br />T 1 C <br />- T-s Arc. 1 cl Egli V -? <br />Vclt in• 5w.11 F.clor <br />Oly U ,t, Front rlw.n U,t. H, Rer1 d <br />Eye p T-1 F_Gulp Covl <br />.ar <br />Cusl Mal.r •I <br />c - C.1 I . <br />COVER SYSTEM: <br />Haul and Place 6" topsoiVbiosoiids over 6" subsoil over 24" local cap material (69 ac) <br />CAT 777B Haul Truck 4 285,560 1.000 285,560 ley) 193.94 (.y/h,) 1,472 $371.23 $546,597.40 $30.02 $44,200.84 $590,798 <br />CAT 992C Loader 1 Trucks Per Loader 4 368 $513.20 $188,910.06 $30.40 $11,192.04 $200,102 <br />D8N Dozer 1 368 $178.86 366,207.10 633.81 $12,443.82 $78,651 <br />11G Grader 1 368 5118.09 547,469.60 632.37 $11,916.68 655,786 <br />Water Truck 1 368 $69.43 625,555.59 630.02 $11,050.21 636,606 <br />Support Eouiament Includes: DaN Dozer. 14G Grader a Water T ck <br /> _ <br />h1c k. a,1 <br />Tc,1?l E?,'p is r„t <br />1,;nIL r <br />Tatalrnl <br />T 1 <br />TOTAL COSTS 2,945 - $ 870,740 .. $ 90,804 961 643; <br />5W L P.a 2011