My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-14_REVISION - M1977493 (64)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-14_REVISION - M1977493 (64)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:17 PM
Creation date
4/6/2011 8:42:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/14/2011
Doc Name
Exhibit List, Ex. 9
From
Climax
To
MLRB
Type & Sequence
AM6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P-rd Ammtlment (AM-06) - Ckmex Mlle <br />CM0000694 <br />CLIMAX MINE RECLAMATION COST ESTIMATE <br />Financial Reporting Unit Rates <br />Tenmile Sludge Cell Km <br />Assumptions: <br />(1) Sludge will fill to within one to two feet of the top of the existing berms. <br />(2) Sludge is alkaline material that will not require liming to bring pH into the ran ge of pH 6-9. <br />(3) The sludge will be allowed to "dry-out" such that it will be traversible with no rmal construction equipment. <br />(4) Revegetation is covered elsewhere. <br />Tasks: <br />(1) Grade out the perimeter of the berms from 2H to IV slopes to final slopes = 3H to 1V using dozer. <br />(2) Haul in growth media (biosolids) to cover graded sludge using Cal 972 Load er and Cat 730 truck fleet. <br />(3) Speed growth media (biosolids) with LGP DS dozer. <br />Timing <br />2011+ <br />Total Cost <br />$127,701 <br />Calculations <br /> <br />ll 1 ?1ni1 I <br />• <br />- <br />Sw+ll <br />? <br />Q <br />W <br />= <br />P d 1 n 1 U I <br />H R <br />d <br />C LU t ? <br />. T t f q p c, <br />osUU Its <br />' <br />l <br />C <br />T <br />ll b <br />t i IA <br />C I/U tM' <br />11 t <br />i <br />t T 1 IC <br />t - <br />TWAr• <br />.? Eq p V <br />olu • <br />, ty <br />- <br />F--to t <br />t, <br />?j eg Fqulp Cc <br />et L.hor a <br />or <br />os <br />a r <br />o <br />os <br />Mrt+r als <br /> _ ? t <br />Grading perimeter of sludge cell to 3HA V slope <br />D7 Dozer 1 9,000 cy 448 cylhr 20.09 $138.24 $2,777.08 $33.81 $679.12 $3,456.20 <br />Load, haul and spread biosolids on graded sludge cell <br />Cat 972 Loader 1 26,614 cy (Depends on Trucks) 134.41 $128.04 $17,209.97 $30.40 $4,086.81 $21,296.78 <br />Cat 730 Trucks (4) 4 26,614 cy 49.50 cylhr 537.66 $127.54 $68,570.95 $30.02 $16,140.07 $84,711.02 <br />D6 Dozer 26.614 cy 200 cylhr 133.07 $103.24 $13,738.2_8 __$33.81 $4.498.46_ _ $18.236.74 <br /> <br />` <br />; _- H i2n1 -_ I ILA `p 1.?9t T,WI - -I la?]I Mve aIC T t I'JSI? <br />TOTAL QUSTS <br />, <br />> <br />625 <br />$ 102,246 <br />25404 <br />$ - $ 127 701 <br /> <br />I <br />I <br />101bI1 L
The URL can be used to link to this page
Your browser does not support the video tag.