Permit Amendment (AM-0e) - Climax Mine <br />CM0000670 <br />CLIMAX MINE RECLAMATION COST ESTIMATE <br />Financial Reporting Unit Rates <br />Storke Complex = <br />Assumptions <br />(1) Reconstruction of the Arkansas River through the Storks Yard is covered elsewhere. <br />(2) Water treatment for seepage and drainage in the Storks area will be required indefinitely thereby warranting perpetual use of SWPPS & 5-Shaft. <br />(3) Following extensive reclamation work in 2004 through 2007, there will still remain approx. 10 acres of "disturbed" areas requiring reclamation. <br />(4) Revegetation work Is covered elsewhere. <br />Tasks <br />(1) Minor grading of areas remaining from previous work in 2004 and 2005 - assume D6 dozer work on 10 acres @ 2 hrs/ac. <br />(2) Haul biosolids from Robinson Staging Area and replacement on 10 acres at 4 inches thick = 5323 cy @ Haul Distance = 2.6 miles. <br />(3) Ceresco OSF Reclamation (Regrading, Subsoil Cover, Topsoil=Biosolids) similar to McNulty OSF. <br />(4) Ceresco OSF Seepage Collection System: 2600 feel collection system along toe (seepage barrier, gravel trench, perforated pipe); 4500 feet pipeline to convey seepage to El DL (12" <br /> HDPE). <br />Timing <br />2011+ <br />Total Costs <br />$281,096 <br />Calculations <br /> % <br /> <br />C.6tfynlt T <br /> <br />otal EquiprrI,I)t <br />costiVnit <br />-: TesyJA rca .-E_ d ant r <br />s Productlvltl, r its rs ,q) e <br />l <br />t Co;t!Unlt Lanpf <br />i, <br />C <br />t Total Labor Gozt Matenols b _Tolel rdn[er(a Cott Total Cm[. - <br /> ?Nn <br />?,9g os Other <br />(1) Minor Grading of Storks Disturbed Areas <br />CAT D6 10 acres 2 hrs/ac 20 $103.24 $2,064.82 533.81 $676.10 $2,740.92 <br />(2) Load Biosolids at Robinson <br />926 Loader 5,323 cy 40.13 $46.88 $1,881.25 $30.40 $1,220.04 $3,101.29 <br />(2) Haul Blosolids from Robinson <br />Generic Truck 5,323 cy 37.90 cy/hr 140.44 $104.50 $14,676.37 $30.02 $4,216.02 $18,892.40 <br />(2) Spread Biosolids at Storks <br />CAT D6 5,323 cy 200 cy/hr 26.62 $103.24 $2,747.76 $33.81 $899.73 $3,647.49 <br />(3) Minor Grading of Ceresco OSF <br />CAT D6 30 acres 2 hrs/ac 60 $296.50 $17,789.90 $33.81 $2,028.31 $19,818.21 <br />(3) Load Biosolids at Robinson <br />926 Loader 16,133 cy 121.62 $46.88 $5,701.84 $30.40 $3,697.78 $9,399.62 <br />(3) Haul Biosolids from Robinson <br />Generic Truck 16,133 cy 37.bO cy/hr 425.67 $104.50 $44,482.21 $30.02 $12,778.23 $57,260.44 <br />(3) Spread Biosolids at Ceresco OSF <br />CAT D6 16,133 cy 200 cy/hr 80.67 $103.24 $8,328.11 $33.81 $2,726.95 $11,055.06 <br />(4) Excavate for Toe Drain Trench 5,000 Cy $ 3.00 $15,000.00 $15,000.00 <br />(4) Drain Rock for Toe Drain 2,670 cy $ 26.00 $69,420.00 $69,420.00 <br />(4) Perforated Pipe for Toe Drain 4,500 lin It $ 9.00 $40,500.00 $40,500.00 <br />(4) Separation geolextile for Toe Drain 9,000 sq yd $ 2.25 $20,250.00 $20,250.00 <br />(4) Toe Drain Collection Sump and Piping 1 each $ 10,000 $10,000.00 $10,000.00 <br /> Hk R d ..T€."h. Tot al EqulpmenLCoat 3 kTotnl LaboGCoit ToW Materfal Cost- Total Cost <br />TOTAL COSTS 915 f $252,842 S28,243 $0 $281,085 <br />IOU L