Laserfiche WebLink
storage account in Riverside Reservoir is depleted. The daily evaporation and <br />seepage losses of 0.33% per day assessed on Riverside storage will continue to be <br />assessed in the projection as required by the Headley Recharge Project decree. <br />The projected deliveries to the Bruce Weir will be assumed to occur on a daily <br />basis according to the following monthly flow rates (based upon monthly average <br />Bruce Weir flow from 2005 to 2009): <br />Month Apr. May Jun. Jul. Aug. Sep. Oct. <br />Flow 1.4 3.1 3.7 2.4 2.7 3.1 3.8 <br />Rate <br />(c. f. s. <br />244% of the assumed Bruce Weir deliveries each day (based upon the transit <br />losses applied in Riverside Irrigation District's decree in Case No. 2002CW86) <br />will be deducted from the Headley Recharge Project account in Riverside <br />Reservoir until the account is exhausted, at which point further projected <br />deliveries will cease. Actual deliveries of water stored in Riverside Reservoir to <br />the Headley Recharge Project are separately accounted for by Riverside Irrigation <br />District pursuant to the decree in Case No. 02CW086. To the extent that such <br />actual deliveries differ from the deliveries projected in this Paragraph 33(B)(6), <br />the actual deliveries shall be reflected in any periodic updates pursuant to <br />Paragraph 33(D). <br />7) Return Flow Obligations from Direct Releases of Water Stored under Jackson <br />Lake Rights: The amount of return flow obligations attributable to Pinneo's <br />previous and projected use of water released for direct augmentation use under the <br />Jackson Lake Rights, unless Pinneo has the right to deliver water available under <br />such rights into the Upper Platte and Beaver Canal for recharge pursuant to <br />Paragraph 28(B)(3). <br />8) Additional or Alternate Supplies: Any additional or alternate net replacement <br />supplies or credits that have been authorized for use in the plan pursuant to <br />Paragraphs 29(A) and 29(B) , the amounts of which are known at the time the <br />projection is made, that Pinneo has secured for any or all of the years of the <br />projection period. <br />C. Projection Limitations and Assumptions. <br />1) Period of Call: The projection shall be completed assuming there is a continuous <br />South Platte River call senior to the senior most priority of all of the Pinneo <br />Feedlot Wells, and that well depletions and return flow obligations must be <br />replaced at all times throughout the projection period. The projection shall further <br />assume that, except as provided in Paragraph 33(F) , during November through <br />March of each year of the projection, the percentage(s) of all plan depletions <br />deemed by this Decree to occur above the North Sterling Canal headgate must be <br />30 of 33