Laserfiche WebLink
replaced by augmentation credits deemed by this Decree, including Paragraph <br />33(B)(8), to accrue above that headgate. <br />2) Estimated River Transit Losses: All projections of augmentation water deliveries <br />shall account for appropriate estimated river transit losses between the point(s) of <br />delivery and point(s) of depletion, as reasonably determined by the Division <br />Engineer. <br />3) Additional Leased Supplies: The projected total volume of water from additional <br />water supplies used under Paragraphs 29(A) and 29(B) of this decree shall be the <br />amount of water which Pinneo has a fixed and definite right to use during the <br />projection period by virtue of Pinneo's lease of such water rights, for the term of <br />any lease or other permission by which Pinneo asserts a right to use such <br />additional supplies. <br />D. Periodic Updates: Pinneo may complete and submit to the Division Engineer and <br />Water Commissioner a periodic update of the annual and monthly projection for the <br />four-year projection period, based on actual to date operations of all augmented <br />structures and augmentation supplies included in the projection, provided that such <br />update complies with the remaining provisions of this Paragraph 33. <br />E. Projection Spreadsheet: The annual and monthly projections for the plan for <br />augmentation shall be submitted on the projection spreadsheet attached hereto as <br />Exhibit H. The projection spreadsheet is not decreed and may be changed from time <br />to time so long as (1) the information required by this decree is included in the <br />spreadsheet; (2) such changes are approved by the Division Engineer following thirty <br />(30) days' advance notice to opposers; (3) such spreadsheet remains adequate to <br />account monthly for projections pursuant to this Paragraph 33; and (4) all information <br />required by this decree is included in the spreadsheet and all changes are approved by <br />the Division Engineer. Disputes over the adequacy of the spreadsheet as proposed to <br />be changed shall be resolved by this Court. <br />F. Limitation of Current Year Pumping and Depletions: Projected monthly depletions <br />from pumping of the Pinneo Feedlot Wells, the Uhlenhopp Well, Headley Recharge <br />Project augmented structures, and return flow obligations from the use of changed <br />storage and direct flow water rights used for augmentation shall be fully replaced in <br />time, location and amount under the terms and conditions of this decree by the <br />amount of projected monthly augmentation supplies as determined under Paragraphs <br />33(B) and 33(C), provided that Pinneo may project net monthly depletions above the <br />North Sterling Canal headgate during the months of November through March in the <br />third and fourth year of the projection that are 1.0 acre-feet per month or less, but <br />only on the condition that there are no projected net monthly depletions during any <br />such month overall, when taking all projected monthly depletions and augmentation <br />supplies located above and below such headgate into account. The pumping of the <br />Pinneo Feedlot Wells shall at all times be limited to the amounts allowed by the <br />projections completed in accordance with these provisions. Except as otherwise <br />31 of 33