Laserfiche WebLink
Bowie No. 1 Mine C-81-038 <br />nmmr%lifinn Chnnf? <br />Task: 137 Site: Bowie No. 1 Mine Date: 2 December 2010 User: JRS <br />Permit Action: 2010 Midterm Review (MT-6) County Delta <br />Description: Demolish and Remove All Structures File Name: C-1981-038 <br /> <br /> Demolition Task Reference Quantity Unit Cost Total Cost <br /> <br /> EAST MINE - CRUSHING & SCREENING LEVEL (cont.) <br /> - 10, 000 Gallon Waste Oil Storage CIRCES 1.00 EA NA <br /> Remove Oil CIRCES 1.00 EA NA <br /> Dispose of Oil CIRCES 5,000.00 GAL NA <br /> Add C02 for Tank Cleaning CIRCES 150.00 LB NA <br /> Haul Tank to Certified Dump CIRCES 1.00 EA NA <br /> Wall CIRCES 534.00 SF $3.7100 $1,981.14 <br /> Slab CIRCES 1,260.00 SF $2.2800 $2,872.80 <br /> -Sewage Treatment Plant Superstructure - SL-2 CIRCES 9,600.00 CF NA <br /> -Guard Shack Superstructure - SL-2 CIRCES 960.00 CF NA <br /> Floor CIRCES 120.00 SF $2.2800 $273.60 <br /> Fence CIRCES 118.00 LF $2.4600 $290.28 <br /> - Culvert Removal CIRCES <br /> 18" Culverts CIRCES 115.00 LF $2.4300 $279.45 <br /> 24" Culverts CIRCES 100.00 LF $3.2800 $328.00 <br /> 48" Culverts CIRCES 125.00 LF $6.6100 $826.25 <br /> -Overland Conveyor - Elevated Portion (Includes Supports) - SL-02 CIRCES 405.00 LF NA <br /> On-Grade Portion (Includes Supports) - SL-02 CIRCES 165.00 LF NA <br /> -Remove Remaining Materials and Debris CIRCES 2,044.00 CY $13.3500 $27,287.40 <br /> - Hazardous Waste Removal - SL-02 CIRCES 10.00 EA NA <br /> Sampling and Analysis CIRCES 10.00 EA NA <br /> Transport Drums to Dump CIRCES 300.00 MI NA <br /> Dumpsite Disposal Charges CIRCES 3.00 EA NA <br /> <br /> WEST MINE - PORTAL LEVEL <br /> -Shop Superstructure - SL-2 CIRCES 90,000.00 CF NA <br /> Floor - SL-02 CIRCES 5,000.00 SF NA <br /> Footing - SL-02 CIRCES 15.00 LF NA <br /> -Fuel Station Slab - SL-2 CIRCES 2,000.00 CF NA <br /> Walls - SL-02 CIRCES 380.00 SF NA <br /> <br /> <br />Demolition Sheets Page 5 of 7