Laserfiche WebLink
Bowie No. 1 Mine C-81-038 <br />rlcmnlifinn Qhccfe <br />Task: 137 Site: Bowie No. 1 Mine Date: 2 December 2010 User: JRS <br />Permit Action: 2010 Midterm Review (MT-6) County Delta <br />Description: Demolish and Remove All Structures File Name: C-1981-038 <br /> <br /> Demolition Task Reference Quantity Unit Cost Total Cost <br /> <br /> WEST MINE - PORTAL LEVEL (cont.) <br /> -Rock Dust Bin Superstructure - SL-2 CIRCES 4,113.00 CF NA <br /> Slab - SL-02 CIRCES 480.00 SF NA <br /> Walls - SL-02 CIRCES 304.00 SF NA <br /> -MCC Superstructure - SL-2 CIRCES 640.00 CF NA <br /> Floor - SL-02 CIRCES 288.00 SF NA <br /> -Substation Slabs - SL-02 CIRCES 155.00 CF NA <br /> Fence - SL-02 CIRCES 198.00 LF NA <br /> -Solid Waste Storage Bin Walls - SL-02 CIRCES 55.00 CF NA <br /> Slab - SL-02 CIRCES 396.00 SF NA <br /> -Remove Underground Septic Tank - SL-02 CIRCES 1.00 EA NA <br /> Remove Sludge CIRCES 1.00 EA NA <br /> Dispose of Sludge CIRCES 1,250.00 GAL NA <br /> Add C02 for Tank Cleaning CIRCES 37.50 LB NA <br /> Haul Tank to Certified Dump CIRCES 1.00 EA NA <br /> -Remove Debris Basin & Riprap Inlet Structure - SL-02 CIRCES 15.00 CF NA <br /> Outlet Structure - SL-02 CIRCES 15.00 SF NA <br /> -Remove French Drain - SL-02 CIRCES 350.00 LF NA <br /> 15" Pipe CIRCES 150.00 LF NA <br /> Culvert Removal CIRCES <br /> 9" Culverts - SL-02 CIRCES 120.00 LF NA <br /> 16" Culverts - SL-02 CIRCES 55.00 LF NA <br /> 24" Culverts - SL-02 CIRCES 50.00 LF NA <br /> 48" Culverts (E Roatcap Creek Culvert) CIRCES 650.00 LF $6.6100 $4,296.50 <br /> <br /> WEST MINE - FAN LEVEL <br /> -Vent Fan Superstructure - SL-02 CIRCES 20,232.00 CF NA <br /> 8" Slab - SL-02 CIRCES 1,244.00 SF NA <br /> 6" Slab - SL-02 CIRCES 48.00 SF NA <br /> Footing - SL-02 CIRCES 58.00 LF NA <br /> Footing - SL-02 CIRCES 4.00 LF NA <br /> Fence - SL-02 CIRCES 52.00 LF NA <br />Demolition Sheets Page 6 of T