Laserfiche WebLink
Bowie No. 1 Mine C-81-038 <br />nAmmnlitinn Chontc <br />Task: 137 Site: Bowie No. 1 Mine Date: 2 December 2010 User: JRS <br />Permit Action: 2010 Midterm Review (MT-6) County Delta <br />Description: Demolish and Remove All Structures File Name: C-1981-038 <br /> <br /> Demolition Task Reference Quantity Unit Cost Total Cost <br /> <br /> EAST MINE - SHOP LEVEL (cont.) <br /> -Tire Shop Superstructure - SL-02 CIRCES 19,200.00 CF NA <br /> Floor CIRCES 3,000.00 SF $2.2800 $6,840.00 <br /> Footing CIRCES 18.00 LF $20.5000 $369.00 <br /> -Loading Bin Superstructure - SL-02 CIRCES 384.00 CF NA <br /> -Loading Dock Wall CIRCES 138.00 SF $3.7100 $511.98 <br /> -Firehouse Superstructure - SL-02 CIRCES 90.00 CF NA <br /> Footing CIRCES 20.00 LF $20.5000 $410.00 <br /> -Solid Waste Storage Bin Wall CIRCES 440.00 SF $3.7100 $1,632.40 <br /> Slab CIRCES 396.00 SF $2.2800 $902.88 <br /> -Sediment Trap Wall CIRCES 144.00 SF $3.7100 $534.24 <br /> -Remaining Materials and Supplies CIRCES 3,585.00 CY $13.3500 $47,859.75 <br /> <br /> EAST MINE - CRUSHING & SCREENING LEVEL <br /> -Crusher/Screening Plant Superstructure - SL-02 CIRCES 129,920.00 CF NA <br /> Footing CIRCES 40.00 LF $20.5000 $820.00 <br /> -Lump Bin Superstructure - SL-2 CIRCES 11,016.00 CF NA <br /> Footing CIRCES 8.00 LF $20.5000 $164.00 <br /> -MCC Superstructure - SL-2 CIRCES 3,456.00 CF NA <br /> Floor CIRCES 432.00 SF $2.2800 $984.96 <br /> -Transfer Tower #2 Superstructure - SL-02 CIRCES 37,180.00 CF NA <br /> Floor CIRCES 676.00 SF $2.2800 $1,541.28 <br /> Footing CIRCES 104.00 LF $20.5000 $2,132.00 <br /> -Truck Loadout Superstructure - SL-2 CIRCES 28,944.00 CF NA <br /> Walls CIRCES 270.00 SF $3.7100 $1,001.70 <br /> Footing CIRCES 12.00 LF $20.5000 $246.00 <br /> -Stacking Tube - SL-2 CIRCES 503.00 CF NA <br /> -Rock Bin Wall CIRCES 256.00 SF $3.7100 $949.76 <br /> Slab CIRCES 144.00 SF $2.2800 $328.32 <br /> <br /> <br /> <br />Demolition Sheets Page 4 of 7