My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-13_PERMIT FILE - C1981038 (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2011-01-13_PERMIT FILE - C1981038 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:28:55 PM
Creation date
4/1/2011 8:27:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
1/13/2011
Section_Exhibit Name
Volume 1 4.03 Roads
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.03 F~DB <br />4.03.1 Raul Roads. (Cont'd.) <br />• due to plaoernent of material. lire embankments are adequate to support the <br />actual wlume of traffic aryl weight and speed of vehicles currently used. <br />No records of ca~aaction are available for the haul road. <br />FSnbanlonents for the construction of the Orchard Valley West Mine haul road <br />will be construc.-ted as described in Volume 6. All provisions of this <br />section will be cor~leted. Records of conq~adion will be kept and are <br />available for inspection by the Division. <br />the existing Or~ird Valley RAM coal stockpile haul road's use has not <br />been restricted due to placP~nent of material. the embanlOnent is adequate <br />to support the projected volume of traffic and weight aryl speed of <br />vehicles currently used (refer to Supplemental Geotechnical F7gineering <br />Study, It7w (Made Coal Haul Road, L3mbe1-t and Associates, Volume 6). No <br />records of compaction are available for the haul road. the bearing <br />surface of the road was found to be inadequate to support the projected <br />volume of traffic and weight and speed of vehicles used. A certified <br />construction design to upgrade the bearing the bearing surface was <br />developed calling for specific cortq~action specifications to be met in <br />accordance with this section. Records of compaction will be kept and made <br />available for Division inspection. <br />Per the Division's request, in the event a subgrade failure occurs, COVCC <br />will repair the subgrade in accordance with this part and have the repairs <br />certified by a professional engineer. <br />• (3) (d) (viii) <br />No records of AASHib specified tests or as~onstrucked moisture content <br />tests are available on the existing Orchard Valley Mine haul road. <br />Material for the Orchard Valley West Mine haul road will be placed only <br />where its moisture content is within acceptable levels to achieve required <br />coaq~action. <br />No records of AASFfio specified tests or as-constructed moisture content <br />tests are available on the existing Orchard Valley R-0~-M coal stockpile <br />haul road. <br />(3) (d) (ix) <br />See 4.03.1(3)(c)(i). <br />(3) (d) (x) <br />lyre Orchard Valley Mine haul road is an existing structure. If any <br />further disturbance for the construction of this haul road is required, <br />temporary erosion control measures will be implemented. Upon coaq~letion, <br />measures will be taken to stabilize all embanlanP.nts with vegetation cover <br />as described i.n Sec-tion 2.05.4 Reclamation Plan -General Requirements. <br />• All existing etnbanlanP~ts at the Orchard Valley Mine were reclaimed <br />immediately following construction. <br />At the Orchard Valley West Mine haul road, erosion control measures will <br />TR 92-18 Revised 07/08/94 <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.