Laserfiche WebLink
4.03 RL~DiB <br />4.03.1 Haul Roads. (Cont'd.) <br />• (2) (a) <br />The Orchard Valley Mine haul road is located on the most stable available <br />slopes to minimize erosion using accepted engineerirg practice. See Map <br />No.'s 8A-9A, SA-9B, and SA-9C. <br />The Orchard Valley West Mine haul road is located on the approximate <br />alignment of the existing Roatcap a~ road. It is located on the most <br />stable available slopes to minimize erosion. See sheet 7 of the Orchard <br />Valley West Portals designs in Volume 6. <br />The Orchard Valley R-0-M coal stockpile haul road was constructed <br />primarily on fill material deposited in the Steven's Gulch drainage on <br />OOVCC owned property. The road has been stabilized through revegetation <br />efforts to minimize erosion. <br />(2) (b) <br />No parts of the Orchard Valley and Orchard Valley West Mine haul roads are <br />located in the channel of an ephemeral stream draining more than one <br />square mile, or the channels of intermittent or perennial streams. <br />A portion of the Orchard Valley R-0-M coal stockpile haul road is located <br />within the channel of Steven's Gulch, an ephemeral stream draining <br />approximately 3 1/2 square miles at the point of crossirg. This portion <br />• of haul road was constructed prior to the enactrnent of SMCRA and the <br />Regulations of the Colorado Mined Land Reclamation Board for Coal Mining <br />detailing the associated specific design criteria for haul roads. <br />(2) (c) <br />No fords were used in the construction of haul roads. All drainage <br />structures for haul roads are culverts. <br />(2) (d) <br />All haul roads are located to minimize downstream sedimentation and <br />flooding. All road cuts and fills required for the construction of haul <br />roads are revegetated as described in Section 2.05.4 Reclamation Plan <br />General Requirements. All haul road drainage culverts are designed to <br />carry at a minimum the l0-year, 24-hour storm runoff. These features are <br />designed, constructed, and maintained to minimize downstream sedimentation <br />and flooding. <br />(2) (e) <br />No diversions of stream channels were r~ured for construction of the <br />haul roads. <br />(3) (a) (i) <br />• The overall grade of the Orchard Valley Mine haul road is approximately 7 <br />percent. <br />TR 92-18 Revised 07/08/94 <br />4 <br />