Laserfiche WebLink
4.03 ROADB <br />4.03.1 Haul Roads. (COnt'd.) <br />• Two studies were conducted and submitted to the Division to meet the <br />requirements of Rule 4.03.1 far the Orchard Valley RAM coal stockpile <br />haul road. The studies, by Lambert and Associates, are entitled <br />"C~eatechnical F7igineering Study, Law Grade Coal Haul Road, Orchard Valley <br />Mine, Paonia, Colorado, August 27, 1990," and "Supplemental Geoter~nical <br />F7xlineering Study, Law Grade Coal Haul Road, Orchard Valley Mine, Paonia, <br />Colorado, February 26, 1992." The latter study is included in Volume 6 <br />and specifies the road bearing surface modifications recamnended as a <br />result of the analysis. <br />(1) (f) <br />The Orchard Valley Mine haul road, after cessation of mining operations, <br />will be left in place and used as acczss to grazing areas as stated in <br />Section 2.05.5 Post Mining Land Uses. The asphalt paved surface will be <br />removed, as specified in the Final Abandonment Section in Volume 6A. <br />The Orchard Valley West Mine haul road from the intersection of the <br />Roatcap access road will be removed after cessation of mining operations. <br />The remainder of the road, from Steven's Gulch road to the intersection <br />with the access road, used by recreational and summer residents, will be <br />left in place. The gravel surface will be left. <br />The Orchard Valley West Mine haul road cuts will be backfilled and the <br />gravel surface narrowed at the cessation of operations. 'This will ensure <br />• long-term maintenance free use for recreational users and summer <br />residents. <br />The Orchard Valley R-O-M coal stockpile haul road will be removed after <br />cessation of mining operations and the land affected shall be reclaimed in <br />accordance with the requirements of 4.03.1(7). <br />(1) (f) (i) <br />CNT! requested and CI~RD approved retention of the Orchard Valley Mine haul <br />road after asphalt removal and revegetation. The reclaimed haul road is <br />part of the approved post-mining land use. The reclaimed haul road will <br />coi~ly with all applicable performance standards. <br />CWI requested and the Division approved retention of the haul road between <br />Steven's Gulch and the intersection of the Roatcap access road. This road <br />will be used as access for recreation and summer residents. This portion <br />of road is approved as part of the post-mining lard use of the area. <br />(1) (f) (ii) <br />The landowners of recor3 requested in writing that the Orchard Valley Mine <br />haul road be left open for future use. Refer to the Land Use Appendix in <br />Volume 9. <br />• The Roatcap access road is an existing road. It is constructed on a <br />right-of-way from the BLM. The Raatcap Owners Access Road Maintenance <br />Association requested in writing that the Orchard Valley West Mine haul <br />road be left open for future use.. Refer to Volume 9, Land Use Appendix. <br />TR 92-18 Revised 07/08/94 <br />3 <br />