Amendment Application 2011 Exhibit Page 8 <br />Amendment Application Exhibit Page 8 <br />The new permit boundary is outside areas immediately adjacent to the river, and to <br />remain outside wooded areas. <br />INITIAL SITE DEVELOPMENT AND FACE WORK: <br />This work was done as laid out in the original Exhibit D. <br />TABLE D-1 REVISED. SUMMARY OF AFFECTED LANDS FOR LIFE OF MINE <br />(('harmed from orininal Table D-1) <br />Activity Period Impacted Maximum Remarks <br /> Acres <br />Access Roads and Entire life of pit 0.9 Access from Highway 145 on a <br />Ramp 10% grade, 30 foot wide roadway, <br /> access to Line Camp, reclaimed. <br />2003-2010 Stripped Start to resent 15.5 Including plant area <br />2003-2010 Mining Start to present 13.0 In progress <br />upper level <br />2003-2010 Mining Start to present 7.1 In progress; in water. <br />lower level <br />Stockpiles Start to resent 3.2 <br />Stockpiles Entire life of it 4.2 <br />Pipeline area 2009-2010 0.7 Now being reclaimed: part to be <br /> used for expanded stockpiles <br />Plant areas Current location 0.7 Plant only <br />Mining entire profile 2011 to 2017 5.8 Includes 0.9 acres currently in <br />of South Field estimated stockpile berm (to be relocated) <br />Stockpile berm (old 2011 to 2017 0.6 Temporary road to be benched in <br />South) (estimated) western stockpile berm, 840 feet <br /> Ion . <br />Total 29 Not a sum, since areas are <br /> worked separately on two levels <br /> and serve multiple purposes. <br />TARIFF-1A qI IMMARY nF AFFF( TF-D I AN17S AS UI- MAKCH 10'11 <br />Status of land Acres Remarks <br />Soil stockpile areas not stripped) 3.2 <br />Stripped (including plant site 2.5 <br />Stripped and partially mined, above water 5.9 <br />Stripped and mined, open water 7.1 Some still being mined <br />Permanent roads/surfaces reclaimed 1.6 Including pipeline and basins <br />Total affected areas 20.3 <br />Buffers/areas not affected inside bounds 2.3 <br />STOCKPILE CONSTRUCTION: <br />As planned, stockpiles of soil have been built on approximately 3200 feet of the <br />perimeter, and are still being built on approximately 300 feet of perimeter. Width and <br />height varies, but is a maximum of 80 feet wide and 20 feet high, and an average of 60 <br />feet wide and 15 feet high. Two gaps exist in this berm at the southeast corner of the <br />Stone Sand & Gravel, LLC 15 MAR 2011 <br />Application for Amendment to Permit M-2001-001: Line Camp Pit SSG-LCP-D1-001