Laserfiche WebLink
Connell Resources Timnath Pit <br />Spill Prevention Control and Countermeasures Plan <br />Revision Date: June 25, 2009 <br />Section 15.0 Other Requirements <br />Page 10-2 <br />10.4 Pipeline Connections 112.7(g)(4)] <br />Pipeline connections are securely capped when they are not in use and blank-flanged when <br />they are in standby service for an extended time. Out of service pipelines are evacuated of <br />their contents. <br />10.5 Facility Lighting 112.7(g)(5)] <br />Lighting is adequate to detect spills and deter vandalism during nighttime hours except <br />lighting in the area by the diesel generator tank was not identified. Specific information <br />regarding tank illumination is presented in Appendix B. <br />