My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-16_REVISION - C1982057
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982057
>
2011-03-16_REVISION - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:48 PM
Creation date
3/16/2011 1:20:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
REVISION
Doc Date
3/16/2011
Doc Name
Reclamation Cost Estimate (Memo)
From
Jim Stark
To
Susan Burgmaier
Type & Sequence
SL3
Email Name
SLB
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seneca II-W Mine C-1982-057 <br />Partial Phase I Bond Release SL-03 <br />Task 038 - Post-Mining Channel Designs <br />PROJECT IDENTIFICATION <br /> <br />Date : 16-Mar-11 Permit C-1982-057 Site: Seneca II-W Mine <br />User: JRS State : Colorado <br />Task: 038 Filename: C057-038 County: Routt <br />Agency Name: Colorado Division Of Reclamation, Mining and Safety <br /> <br />Permit Action: Partial Phase I Bond Release SL-03 - RELEASABLE AMOUNT <br /> <br />Task Description: Construct Post-Mining Drainage Channels <br /> <br /> <br />Channel Fabric (SY) Riprap (C1) <br /> <br />006 2,333 583 <br />006-NE1 1,333 333 <br />006-NE2 171 43 <br />006-E1 333 83 <br />006-E2 267 67 <br />PM-1 1,400 350 <br />PM-2 1,010 250 <br />PM-2D <br />PM-3 1,300 325 <br />PM-4 1,152 287 <br /> <br /> <br />Total 9299.0 2321.0 <br /> <br />Materials Needed: Geotextile (SY): 9,299 Riprap (CY): 2,321 <br /> <br />Material Costs: Geotextile (SY): $ 2.12 Riprap (CY): $ 51.80 <br />Means Reference 31 32 19.16 1500 31 37 13.10 0100 <br /> <br /> <br />Totals: Geotextile (SY): $ 19,713.90 Riprap (CY): $ 120,228.32 <br /> <br /> <br />Hours: Geotextile (SY): 106.27 Riprap (CY): 299.49 <br /> 87.5 SY/HR 7.75 CY/HR <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Total Post-Minim Channel Reconstruction hours: 405.76 <br /> <br />Total Post-Minim Channel Reconstruction Cost: $ 139 942.22 <br />jrs Page 1 16-03-11
The URL can be used to link to this page
Your browser does not support the video tag.