My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-16_REVISION - C1982057
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982057
>
2011-03-16_REVISION - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:48 PM
Creation date
3/16/2011 1:20:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
REVISION
Doc Date
3/16/2011
Doc Name
Reclamation Cost Estimate (Memo)
From
Jim Stark
To
Susan Burgmaier
Type & Sequence
SL3
Email Name
SLB
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost EstimatingSoftware <br />DEMOLITION WORK <br />PROJECT IDENTIFICATION Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task # : 115 State : Colorado PermiUjob# : C-82-057 <br />Date : 16-Mar-2011 County : Routt Abbreviation :none <br />User : JRS Site : Seneca li-W Mine Filename :C057-115 <br />Permitting action : Partial Phase 1 Bond Release SL-03 <br />Task description : Demolish and Remove All Structures <br />UNIT COSTS Last unit cost update : January, 2001 Location adjustment : 99.30% <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />Remove All Culverts (per page 25.1-23) <br /> <br /> <br />-24" Culverts 24"x700LF Pipe, CMP- 24 in. diam. 700.00 LF $13.8562 $9,699.31 <br />-30" Culverts 30x240LF Pipe, CMP-30 in. diam. 240.00 LF $24.0452 $5,770.86 <br />-36" Culverts 36 x120LF Pipe, CMP - 36 in. diam. 120.00 LF $24.2763 $2,913.16 <br /> <br />48"Culverts 48"x240 Pipe, CMP- 48 in. diam. 240.00 LF $31.9380 $7,665.13 <br />-60"Culverts 60"x120LF Pipe, CMP- 60 in. diam. 120.00 LF $50.9002 $6,108.03 <br />-72" Culverts 72"x120LF Pipe, CMP- 72 in. diam. 120.00 LF $58.3805 $7,005.66 <br /> <br /> <br />Shop Area <br />-Bath House Superstructure 55x12'x10' Demo./disp./existing pit - 10K' haul 6,600.00 CF $0.1249 $824.27 <br />-Bath House Floor 55'xl2'x6" Demo./disp. exs. pit 6" th.- 10K ft. 660.00 SF $1.5921 $1,050.75 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />-Remove Diesel Fuel Tanks (3) 10,000 Gallons Exc./load, non-leaking-9K42Kgal. 3.00 EA $782.0000 $2,346.00 <br />-Remove Sludge from Tank Bottom 10,000 Gallons Remove contents - 9K-12K gal. 3.00 EA $250.5000 $751.50 <br />-Add C02 for Tank Cleaning 10,000 Gallons Insert dry ice - 1.5 lbs.1100 gal. 450.00 LS $1.5700 $706.50 <br />-Dispose of Tank Sludge Assume 1,500 Gallons Off-site sludge disposal -Avg. 1,500.00 GAL $3.3300 $4,995.00 <br />-Transport Tank to Approved Storage Facility 10,000 Gallons Haul to cert. dump - 9K-12K gal. 3.00 EA $875.0000 $Z625.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Subtotal (unadjusted): $52,461 Total Cost (adjusted for location): $52,094
The URL can be used to link to this page
Your browser does not support the video tag.