Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task #: 035 <br />Date : 0311612011 <br />User : JRS <br />Permit/job #: C-1982-057 <br />Abbreviation :none <br />Filename : C057-035 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Partial Phase / Bond Release SL-03 <br />Task description :Finish Grade All Mine Areas <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 14H <br />CIRCES Cost Estimating Software <br />MOTOR GRADER WORK <br />State : Colorado <br />County :Routt <br />Site : Seneca li-W <br />Attachment no. 1 :NA <br />Attachment no. 2 : Multi-shank ripper <br />Horsepower: 215 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown Ownership cost/hour : $45.57 NA <br />Grader operating cost/hour : $46.26 100 <br />Ripper operating cost/hour : $0.00 0 <br />Operator cost/hour : $24.50 NA <br />Total unit cost/hour : $116.32 Total fleet cost/hour : $116.32 <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 400.00 acres <br />Source of estimated acreage :Page 25-1-13 <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees ' • at 0 degrees, blade is perpendicular <br />Effective blade length : 12.10 feet to direction of travel. <br />Width of blade overlap per pass : 2.00 feet <br />Net grading or ripping width per pass : 10.10 feet " •• width of ripper beam on ripping applications <br />Unadjusted hourly unit production : 1.5303 acres/hour <br />Job Condition Correction Factors Source <br />Average site altitude : 7,500 feet Altitude adjustment factor : 1.00 I (Cat HB) <br /> Job efficiency adjustment factor : 0.85 (1sh/d, mod.) <br /> Net job correction : 0.8500 multiplier <br />Adjusted hourly unit production : 1.3008 acres/hour <br />Adjusted hourly fleet production : 1.3008 acres/hour <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) Total job time : 307.51 hours <br />Unit cost : $89.43 per acre Total job cost : $35,771