My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-16_PERMIT FILE - C1996083A (26)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-11-16_PERMIT FILE - C1996083A (26)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:00 PM
Creation date
3/16/2011 8:24:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
11/16/2010
Section_Exhibit Name
Exhibit 01 Coal and Water Rights
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A <br />Conditions of Surface Use <br />Mountain Coal Company, Geotechntcal t3oreholes <br />Administrative <br />1. The operator will notify the USFS Paonia Ranger District 48 hours in advance of <br />mobilizing heavy equipment (including road maintenance equipment) onto <br />National Forest System lands. <br />2. Bowie has the responsibility to see that their construction and drilling operations <br />are conducted in such a manner which conforms to (1) applicable Federa! taws <br />and regulations, and (2) with State and local laws and regulations to the extent <br />that such State artd focal laws are applicable on Federal leases. <br />3. A person designated by the company to make decisions will be on site during <br />initial disturbance and set up. <br />Soils <br />4. Design soil stockpiles to minimize risk of wind and soil erosion and to maintain <br />the optimum soil viability. <br />5. If a spill occurs, contaminated soil will be removed from National Forest System <br />lands, and be properly disposed of prior to backfilling and reclamation. <br />6. Revegetate disturbed soils by the end of the first growing season. <br />Water Resources <br />7. No refueling or lubricating would take place within 100 feet of wetlands and other <br />waterbodies or drainages. Heavy equipment, hazardous materials, chemicals, <br />fuels, etc., would not be stored within 100 feet of wetlands or surface waters. <br />8. No soil generated from excavation, site preparation, or other operations shall be <br />deposited within 100 linear feet of any drainage with flowing water. <br />9. Sedimentation control devices wilt be used along roads and drill pads as directed <br />by the USFS representatives. Devices may include, but are not limited to <br />vegetation from clearing, excelsior wattles, straw bales, etc. <br />f 0. A minimum of 3 feet of freeboard in the mud pii would be maintained between <br />the maximum fluid level and the top of the berm. <br />11. All fuel and hazardous material sU~rage on the pad site must have double <br />containment. <br />12. All project disturbances are restricted to the western side of the Hubbard Creek <br />Road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.