Laserfiche WebLink
Agency or organization name: DRMS <br />Permit or other job action : Final Reclamation Cost Estimate - MD-05 <br />Task description :Establish Final Grade on MWP2 Pad <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat D7R DS Series 11 - 7SU <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : NA <br />Horsepower: 240 <br />Shift basis :-I per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $43.55 NA <br /> Operating cost/hour : $64.95 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $147.04 Total fleet cost/hour : $147.04 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 10,000 CCY factor : 1.115 volume : 11,150 LCY <br />Source of estimated volume :Plan Submitted <br />Source of estimated swell factor : CAT Handbook - - --- <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : <br />_ 150 feet <br />__ Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 518.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br /> <br />Compacted fill or embankment - <br />Spoil pile: <br />0.80 -- -- --- ------ <br />(fnd-rf) <br /> <br /> Push gradient : 1.11 (Cat HB <br />) <br />Average push gradient : 5.00 % (neg) Altitude : 1.00 _ <br />(Cat HB) <br />Average site altitude : 6,900 feet Material weight : _ _0.92 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight:- . 2,500 _lbs/LCY Net correction : 0.46 <br />Weight description : ---- <br />Clay - Dry _ Adjusted unit production : 238.57 LCY/hr <br /> Adjusted fleet production : 238.57 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 46.74 Hours <br />Unit cost : $0.616 /LCY Total job cost : $6,872 <br />