My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-18_REVISION - P2008046
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2008046
>
2011-02-18_REVISION - P2008046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:32:33 AM
Creation date
2/25/2011 1:18:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
REVISION
Doc Date
2/18/2011
Doc Name
NOI MD approval (MD-05)
From
DRMS
To
American Shale Oil, LLC
Type & Sequence
MD5
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />Basic machine : Cat D7R DS Series 11 - 7SU <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank riDDer <br />Shiftbasis : 1 per day <br />Data source:- (CRG) <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $43.75 NA <br />Dozer operating cost/hour : E$64.48 100 <br />Ripper operating cost/hour : $5.32 100 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $152.09 Total fleet cost/hour : $152.09 <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : NA NA <br />Area : 1.40 acres <br />Selected estimating method : Area <br />Load factor : NA Bank volume <br />Rip depth (ft) : 2.00 Volume <br />Horsepower: 240 <br />NA <br />4,517 <br />BCY <br />BCY or CCY <br />Source of estimated quantity: Proposed road conditions <br />Source of estimated l oad factor : NA -- - -- <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 2 <br />368 <br />53 cu <br />d <br />/h <br /> , <br />. . y <br />s. <br />our <br />Area : Avg. ripping depth : 2.00 feet/pass Site altitude : 6,900 feet <br />Average ripping width : 6.50 feet/pass Altitude adjustment : - <br />1.00 -- <br />(Cat HB) <br />Average ripping length : 300.00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed 88.00 feet/minute Net job correction 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.734 acres/hour Adjusted unit production 1,965.88 cu. yds./hour <br />Unadjusted production : 2,368.53 cu. yds./hour Adjusted fleet production : 1 <br />965.88 cu <br />yds <br />/hour <br /> , . <br />. <br />JOB TIME AND COST <br />Fleet size : 1 dozer(s) Total job time : 2.30 hours <br />Unit cost : $0.077 per cu. yd. Total job cost : $349 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.