My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-18_REVISION - P2008046
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2008046
>
2011-02-18_REVISION - P2008046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:32:33 AM
Creation date
2/25/2011 1:18:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
REVISION
Doc Date
2/18/2011
Doc Name
NOI MD approval (MD-05)
From
DRMS
To
American Shale Oil, LLC
Type & Sequence
MD5
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name: DRMS <br />Permit or other job action :Final Reclamation Cost Estimate - MD-05 <br />Task description :Establish Final Grade on MWP Pad <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D7R DS Series 11 - 7SU <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : NA <br />Horsepower : 240 <br />Shift basis :-I per day <br /> Data source: <br />(CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $43.55 NA <br /> Operating cost/hour : $64.95 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 _ <br />NA <br /> Total unit cost/hour : $147.04 Total fleet cost/hour : $147.04 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 10,000 CCY factor : 1.115 volume : 11,150 LCY <br />Source of estimated volume: Plan Submitted <br />Source of estimated swell factor : CAT Handbook - -- <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> <br />Aver <br />h d Operator skill : 0.75 (avg.) <br />age pus <br />istance : 100 feet Material consistency : 0 <br />90 <br /> <br />Unadj <br />t <br />d h <br />l <br />_ <br />_7 . (Cat-H8) <br />us <br />e <br />our <br />y production : 14.3 LCY/hr Dozing method : 1.00 <br />(gen.) <br /> <br />Material consistency description : Visibility : 1.00 _ <br />(avg.) <br /> <br />Compacted fill or embankment Job efficiency : 0.83 (lshift/day) <br /> Spoil pile : 0 <br />80 <br /> . (fnd_rf) <br /> <br />Average push gradient : <br />5.00 % (neg) Push gradient : 1.11 (Cat HB) <br /> <br />Avera <br />e sit <br />ltit <br />d Altitude : 1.00 (Cat HB) <br />g <br />e a <br />u <br />e : 6,900 feet Material wei <br />ht : 0 <br />92 <br /> g . (Cat HB) <br /> <br />Mate <br />i <br />l <br />i <br />h Blade type : <br />- 1.00 (S/SU/U) <br />r <br />a <br />we <br />g <br />t : 2,500_lbs/LCY Net correction : 0.46 <br />Weight description : -- <br />Clay - Dry Adjusted unit production : 328 <br />41 LC <br /> . Y/hr <br /> Adjusted fleet production : 328.41 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 33.95 Hours <br />Unit cost : $0.448 /LCY Total job cost : $¢992 <br />
The URL can be used to link to this page
Your browser does not support the video tag.