Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION . <br />Task #: 05a State :Colorado Permitljob# P-2008-046 <br />Date : 0211512011 County :Rio Blanco Abbreviation :none <br />User: THM Site :Amso Filename :P046-05a <br />Agency or organization name: DRMS <br />Permit or other job action : Final Reclamation Cost Estimate - MD-05 <br />Task description : Establish Final Grade on HB Pad - - <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D7R DS Series 11 - 7SU <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :NA <br />Horsepower: 240 <br />Shiftbasis : 1 per day <br /> Data source: <br />(CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $43.55 NA <br /> Operating cost/hour : $64.95 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $147.04 Total fleet cost/hour : $147.04 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 12,600 CCY factor : 1.115 volume : 14,049 LCY <br />Source of estimated volume :Plan Submitted <br />Source of estimated swell factor : CAT Handbook --- - - <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg. <br />) <br /> <br />Average push distance : <br />- <br />150 feet <br />-- <br />Material consistency : <br />0.90 - <br />- <br />(Cat HB) <br />Unadjusted hourly production : 918.9 LCY/hr Dozing method : 1.00 (gen.) <br /> <br />Material consistency description : Visibility : 1.00 (avg.) <br /> <br />Compacted fill or embankment Job efficiency : <br />-- 0.83 (lshift/day) <br />- - --- <br />- - Spoil pile : 0 <br />80 f <br />d <br /> - . ( <br />n <br />-rf) <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : _ <br />1.00 (Cat HB) <br />Average site altitude : 6,900 feet <br />Material weight : <br />0.92 --- <br />(Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,500 Ibs/LCY Net correction :- 0.46 <br />Weight description <br />Clay - Dry Adjusted unit production : 238 <br />57 LCY/ <br /> . hr <br /> Adjusted fleet production : 238.57 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 58.89 Hours <br />Unit cost : $0.616 /LCY Total job cost : $8,659