Laserfiche WebLink
C- 2010 -089 PAR Part 2 <br />New Horizon North Mine <br />5- Jan -2011 <br />Page 8 of 13 <br />of any public road, except where mine access or haul roads join that right -of -way. The <br />Division understands that for the Special Use Permit, WFC has requested approval to disturb <br />the ground surface to within 25 feet of the County's right -of -way. Please incorporate this <br />information into the text and map(s) of the PAP. <br />4. On Page 15 of Section 2.05.3(3), in the County Roads section, please add the phrase, "the <br />outside right -of -way of immediately prior to "current public roads." <br />5. The Division has several comments regarding Map 2.05.3(3) -2 - Haul Road Alignment and <br />Details: <br />a) No Legend has been provided. Please provide a Legend that identifies all features and <br />symbols. <br />b) The font used for Haul Road stationing in the plan and profile views is too small. <br />Please increase the font size. It may be preferable to show the stationing only at <br />increments of 500 feet, and use tick -marks for the intermediate 100 -foot stations. <br />c) One segment of the East Haul Road appears to have a grade of 12.41 %. The Rules <br />preclude the use of grades steeper than 10 %. Please review the profile and revise <br />accordingly. <br />d) The alignment shown for the West Haul Road appears to encroach upon the proposed <br />location of Pond NHN 002. Please review and revise as appropriate, in order to keep <br />the haul trucks out of the pond. <br />e) On the Haul Road profiles, please add the various culvert pipes in their respective <br />locations, and identify features such as Meehan Draw. <br />f) The Typical Section depicts only the "fill" situation. Please modify the typical section <br />to also represent the "cut" situation. <br />6. Please provide a Plan and Profile for the proposed Equipment Corridor. Although not a <br />Haul Road, per se, it will be used by various pieces of heavy equipment, and will cause <br />disturbance which will need to be reclaimed. <br />2.05.3L5) — Topsoil <br />A section by this number was not provided with the application submittal. Please revise the <br />PAP to include a section addressing the requirements of this Rule. Conversely, if WFC <br />intends to incorporate the topsoil narrative and maps elsewhere in the permit, please provide <br />a brief section here referring the reader to the location where the required information may <br />be found. <br />2. In accordance with the requirements of 2.05.3(5), please also specify the volume(s) of <br />topsoil to be stockpiled and incorporate this information into the PAP text and map. Please <br />describe the methods that will be used to achieve compliance with the topsoil storage <br />requirements of 4.06.3. <br />2.053(6) — Overburden <br />