Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task #: 02A State: Colorado <br />Date: 1/11/2011 County: Pitkin <br />User: GRM Site: White Banks Mine <br />Permit/job#: M1999042 <br />Abbreviation: None <br />Filename: M042-02a <br />Agency or organization name: DRMS <br />Permit or other job action: 2011 Update <br />Task description: Rip parking lot and storage areas prior to topsoil <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8R Series II - <br />8SU (2005) <br />Ripper Attachment: 3-Shank Ripper <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Horsepower: 310 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br /> Utilization <br /> <br />$54.04 NA <br />$70.61 100 <br />$6.54 100 <br />$38.49 NA <br />$169.68 <br /> <br />$169.68 <br />MATERIAL QUANTITIES <br />Selected estimating method: Area <br />Alternate Methods: <br />Seismic: NA <br />Area: 3 <br />Bank Volume NA <br />acres Rip Depth (ft) 2.00 <br />BCY NA <br />Volume: 8,067 BCY or CCY <br />Source of estimated quantity: Exhibit E Map <br />