Laserfiche WebLink
HOURLY PRODUCTION <br />Area: <br />Seismic Velocity: NA feet/second <br /> <br />Average Ripping Depth: 2.56 mph <br />Average Ripping Width: 7.08 degrees <br />Average Ripping Length: 100.00 feet <br />Average Dozer Speed: 88.00 feet <br />Average Maneuver Time: 0.25 feet <br />Production per unit area: 0.703 acres/hour <br /> <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: 0.703 Acres/hr <br />Site Altitude: 6,800 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br /> <br />Adjusted Hourly Unit Production: 0.58 Acres/hr <br />Adjusted Hourly Fleet Production: 0.58 Acres/hr <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 4.28 Hours <br />Unit cost: $290.625 Per acre FTotal job cost: $727.00 <br />