Laserfiche WebLink
HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production: 1,400.0 LCY/hr <br />Material consistency description: <br />Compacted fill or embankment <br />Average push gradient: 30 % <br />Average site altitude: 6,800 feet <br />Material weight: 3,3001bs/LCY <br />Weight description: <br />Decomposed rock - 75% Rock, 25% Earth <br />Job Condition Correction Factor Source <br />Operator skill: 0.750 (AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 0.900 (SSD-FC) <br />Push gradient: 0.298 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material weight: 0.697 (CAT HB) <br />Blade type: 1.000 (PAT) <br />Net correction: CNetCorrection <br />Adjusted unit production: 146.58 LCY/hr <br />Adjusted fleet production: 146.58 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $1.126 /LCY <br />Total job time: 6.14 Hours <br />otal job cost: $1,014.0 <br />