My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (162)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (162)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
12/28/2010 1:49:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. II, Appendix D, Weekly Reports, Part 6.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IIIIIIIINA <br />amec <br />Earth 8 Environmental <br />E) Overburden to Stockpile <br />1) VLF <br />No work performed during the week. <br />F) Cut to Fill <br />1) VLF <br />A CAT 385 excavator and a John Deere 850 excavator were used to excavate structural fill <br />material in the following areas: between stations E16+00 (+/-) and E18+00 (+/-), <br />approximately 0 to 75 feet right of centerline; between stations F2+00 (+/-) and F6+00 (+/-), <br />approximately 0 to 400 feet right of centerline; between stations H6+00 (+/-) and H11+00 <br />(+/-), approximately 0 to 75 feet left of centerline; between stations J26+00 (+/-) and J29+00 <br />(+/-), approximately 100 to 150 feet right of centerline; between stations K0+00 (+/-) and <br />K4+00 (+/-), approximately 150 to 200 feet right of centerline; and between stations K8+00 <br />(+/-) and K10+00 (+/-), approximately 100 to 150 feet right of centerline. The structural fill <br />material was loaded into CAT 777 haul trucks. <br />Prior to structural fill placement, existing fill temperatures were monitored and found to be at <br />or above 41 °F. Ambient temperatures were monitored on an hourly basis, by an AMEC <br />representative during fill placement. No fill material was placed during ambient temperatures <br />less than 32°F. <br />Structural fill was placed in the following areas: between stations A27+00 (+/-) and A37+00 <br />(+/-), approximately 0 to 250 feet left of centerline; between stations B4+00 (+/-) and B7+00 <br />(+/-), approximately 0 to 150 feet right of centerline; between stations D0+00 (+/-) and D3+00 <br />(+/-), approximately 50 feet left of centerline to 50 feet right of centerline; between stations <br />F2+00 (+/-) and F6+00 (+/-), approximately 0 to 150 feet left of centerline; and between <br />stations J23+00 (+/-) and J25+00 (+/-), approximately 0 to 75 feet left of centerline. Structural <br />fill was placed in 18" to 24" lifts using various CAT dozers. Each lift was moisture <br />conditioned using a CAT 773 water truck (when necessary) and compacted using a 10-ton <br />vibratory smooth drum compactor, passing over the entire fill surface at least 4 times (method <br />compaction technique is applicable). <br />Structural fill (processed ore) was placed within the Phase IVa VLF between stations G3+00 <br />(+/-) and G11+00 (+/-), approximately 25 to 50 feet left of centerline and between stations <br />G15+00 (+/-) and G30+00 (+/-), approximately 50 to 100 left of centerline. Fill material <br />(processed ore) was excavated from the Phase IVc re-certification area, the old LOB haul road, <br />and the southeast corner of Phase IVa using a John Deere 850 excavator loading the material <br />into 40-ton articulating haul trucks. Structural fill was placed using a CAT D-8 dozer in 12" <br />loose lifts and moisture conditioned as needed using a CAT 773 water truck. Compaction was <br />achieved using a 10-ton vibratory smooth drum compactor. Nuclear density testing was <br />performed with results averaging 95% of maximum dry density. Moisture density relations <br />were obtained in accordance with ASTM D698-07. Ambient and fill temperatures were <br />monitored and recorded during the placement of the processed ore in this area. All material <br />met minimum specifications throughout the placement process. <br />VLF Weekly Report WE 11.14.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.