My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (162)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (162)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
12/28/2010 1:49:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. II, Appendix D, Weekly Reports, Part 6.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AlldrII& <br />amec <br />Earth 8 Environmental <br />Blast pattern drilling was performed in the following areas: between stations A6+15 (+/-) and <br />A7+20 (+/-), approximately 15 feet left of centerline to 40 feet right of centerline; between <br />stations H3+50 (+/-) and 115+40 (+/-), approximately 0 to 75 feet left of centerline; between <br />stations H9+25 (+/-) and H10+80 (+/-), approximately 50 feet left of centerline to 50 feet right <br />of centerline; and between stations F2+35 (+/-) and F3+70 (+/-), approximately 0 to 100 feet <br />right of centerline using three track mounted drill rigs. Blasting was performed in these areas <br />Monday (11/9/2009), Tuesday (11/10/2009), Wednesday (11/11/2009), and Thursday <br />(11/12/2009). <br />G) Material Processing <br />1) South Cresson Clay Processing Area <br />Processing of Soil Liner Fill material continued at the South Cresson Clay Process. A CAT D-8 <br />dozer, a CAT 320 excavator, and a CAT 966 front-end loader were used to process the material. <br />Location This Week <br />tons Cumulative <br />tons Comments <br />So Cresson Clay Processing 8,397 131,267 <br />Squaw Gulch Processing 0 35,816 Processin in area complete. <br />Total 8,397 163,175 <br />H) ADR and Crusher Waterlines <br />Welding of the steel portion of the ADR waterline continued. Approximately 180 linear feet of <br />each pipe size (10" and 12") was installed during the week. Testing of the welds to be performed <br />next week. <br />Pipe trench excavation and bedding was performed throughout the week for the Crushing <br />waterline using a CAT 330 excavator and a CAT 980 front-end loader. The pipe bedding material <br />was moisture conditioned and compacted using the bucket of the CAT 330 excavator. <br />Approximately 700 linear feet of pipe trench was excavated and bedded during the week. <br />After preliminary air testing of the previously installed Crushing waterline HDPE pipe, backfilling <br />was performed. Approximately 500 linear feet of pipe trench was backfilled using a CAT 980- <br />front-end loader and a CAT 330 excavator. <br />I) Miscellaneous <br />No work performed during the week. <br />III) Underground Workings <br />A) Drilling <br />The 84" culvert was capped using concrete, and a temporary 10" drainpipe was installed in this <br />area. <br />B) Mine Shaft/Stope Remediation <br />Coordinates received from John Lupo were staked, locating the Thompson and Kitty Lane <br />underground workings. The Thompson shaft (UG #3008) is in a fill area. A CAT 345 excavator <br />was used to attempt to encounter the shaft. The area was excavated to approximately 15 feet in <br />depth and hard rock was encountered. John Lupo suggested that the excavation be backfilled with <br />VLF Weekly Report WE 11.14.09.D.doc