Laserfiche WebLink
amec <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Work Element: Phase 5 CQA/ VLF <br />Date: November 14, 2009 <br />Reporting Period: 11/08/09 through 11/14/09 <br />Days S M T W T F S <br />Work Shifts D D D D D D <br /> <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 28F to 41"F (+/-) High: 36"F to 67"F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: Ames worked until 8:00pm on Wednesday (11/11/2009) to stay ahead of the geomembrane <br />installer. Work activities were paused at approximately 10:00am on Saturday (11/14/2009) due <br />to snow. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />No work performed during the week. <br />B) Stripping <br />1) VLF <br />No work performed during the week. <br />C) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />D) Slope Contouring <br />1) VLF <br />Slope contouring was performed in between stations E15+00 (+/-) and E16+00 (+/-), <br />approximately 75 to 100 feet right of centerline and between stations H0+00 (+/-) and H4+00 <br />(+/-), approximately 50 feet left of centerline to 50 right of centerline. Contouring was <br />performed using various CAT dozers and CAT excavators. Material generated as the cut <br />progressed was pushed down the slope. <br />VLF Weekly Report WE 11.14.09.D.doc