My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (179)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (179)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
12/27/2010 1:25:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. II, Appendix D, Weekly Reports, Part 5.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec'* <br />Earth & Environmental <br />E) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas: between stations A0+00 (+/-) and <br />Al+00 (+/-), approximately 0 to 50 feet left of centerline; between stations H31+00 (+/-) and <br />H34+00 (+/-), approximately 0 to 100 feet left of centerline; and between stations J1+00 (+/-) <br />and J11+00 (+/-), approximately 0 to 300 left of centerline. Contouring was performed using <br />various CAT dozers. Material generated as the cut progressed was pushed down the slope. <br />F) Overburden to Stockpile <br />1) VLF <br />Oversize rock within the Phase 5 VLF fill area was removed from fill areas and hauled to the <br />overburden stockpile area east of the east perimeter road between stations A28+00 (+/-) to <br />A36+00 (+/-). <br />G) Cut to Fill <br />1) VLF <br />A John Deere 850 excavator, a CAT 375 excavator, and a CAT 385 excavator excavated <br />structural fill material from the following areas: between stations between stations A6+00 (+/-) <br />and A8+00 (+/-), approximately 30 to 75 feet left of centerline; between stations A8+00 (+/-) <br />and J28+00 (+/-), approximately 0 to 40 feet right of centerline; between stations H16+00 (+/-) <br />H32+00 (+/-), approximately 0 to 150 feet left of centerline; and between stations J27+00 (+/-) <br />and J29+00 (+/-), approximately 0 to 50 right of centerline. The structural fill material was <br />loaded into CAT 777 haul trucks. The material was transported to the following fill areas <br />throughout the shift: <br />Structural fill material was placed in the following areas: between stations A34+00 (+/-) and <br />A46+00 (+/-), approximately 100 feet left of centerline to 50 feet right of centerline; between <br />A54+00 (+/-) and A61+00 (+/-), approximately 50 to 150 feet right of centerline; and between <br />stations K12+00 (+/-) and K13+50 (+/-), approximately 100 to 200 feet right of centerline. The <br />structural fill material was spread using various CAT dozers in 18" to 24" lifts. Each lift was <br />moisture conditioned using a CAT 773 water truck (when necessary) and compacted using a <br />10-ton vibratory smooth drum compactor, passing over the entire fill surface at least 4 times <br />(method compaction technique is applicable). <br />Blast pattern drilling was performed between stations J27+00 (+/-) and J29+00 (+/-), <br />approximately 30 feet left of centerline to 30 feet right of centerline and between stations using <br />two track mounted drill rigs. Blasting was performed in this area on Tuesday (9/9/2009). <br />H) Material Processing <br />1) South Cresson Clay Processing Area <br />Processing of Soil Liner Fill material continued at the South Cresson Clay Processing area. A <br />CAT D-6 dozer, a CAT 330 excavator, and a CAT 966 front-end loader were used to process <br />the material. <br />VLF Weekly Report WE 09.12.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.