My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (179)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (179)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
12/27/2010 1:25:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. II, Appendix D, Weekly Reports, Part 5.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame <br />Earth 8 Environmental <br />Location This Week <br />tons Cumulative Comments <br />So Cresson Clay Processing 3,486 84,362 <br />Squaw Gulch Processing 0 35,816 Processing in area complete. <br />Total 3,486 120,178 <br />I) New ADR Water Tank and Waterline <br />Previously placed HDPE pipe and pipe bedding was backfilled using material removed during <br />trench excavation. Backfilling was performed using a CAT 345 track excavator, a CAT 966 front- <br />end loader, and a 10-ton vibratory smooth drum roller. <br />J) Miscellaneous <br />Exposing of the old Phase IV solution lines at the northeast corner of the facility was performed <br />using a CAT 330 excavator and a John Deere 35D track excavator. <br />Removal of the old solution lines was performed by cutting the welds in the lines using an <br />oxy/acetylene cutting torch. <br />III) Underground Workings <br />A) Drilling <br />No work performed during the week. <br />B) Mine Shaft/Stope Remediation <br />No work performed during the week. <br />C) Lateral/Slot Remediation <br />No work performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial during the week. <br />V) VLF Geosynthetics <br />No work performed during the week. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />VLF Weekly Report WE 09.12.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.