Laserfiche WebLink
ame <br />Earth 8 Environmental <br />Location This Week <br />tons Cumulative Comments <br />So Cresson Clay Processing 3,486 84,362 <br />Squaw Gulch Processing 0 35,816 Processing in area complete. <br />Total 3,486 120,178 <br />I) New ADR Water Tank and Waterline <br />Previously placed HDPE pipe and pipe bedding was backfilled using material removed during <br />trench excavation. Backfilling was performed using a CAT 345 track excavator, a CAT 966 front- <br />end loader, and a 10-ton vibratory smooth drum roller. <br />J) Miscellaneous <br />Exposing of the old Phase IV solution lines at the northeast corner of the facility was performed <br />using a CAT 330 excavator and a John Deere 35D track excavator. <br />Removal of the old solution lines was performed by cutting the welds in the lines using an <br />oxy/acetylene cutting torch. <br />III) Underground Workings <br />A) Drilling <br />No work performed during the week. <br />B) Mine Shaft/Stope Remediation <br />No work performed during the week. <br />C) Lateral/Slot Remediation <br />No work performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial during the week. <br />V) VLF Geosynthetics <br />No work performed during the week. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />VLF Weekly Report WE 09.12.09.D.doc