Adr%k <br />ame <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Work Element: Phase 5 CQA/ VLF <br />Date: September 12, 2009 <br />Reporting Period: 09/06/09 through 09/12/09 <br />Days S M T W T F S <br />Work Shifts - D D D D - <br /> - - N N N N - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 38°F to 49°F (+/-) High: 467 to 75°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: No delays due to weather. Ames construction was completely off site Monday the 7th due to the <br />Labor day holiday, no work was performed. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />No work performed during the week. <br />B) Stripping <br />1) VLF <br />No work performed during the week. <br />C) Topsoil Relocation <br />1) VLF <br />No work performed during the week. <br />D) Subgrade Preparation <br />1) VLF <br />Subgrade preparation was performed between stations A51+00 (+/-) and A60+00 (+/-), <br />approximately 0 to 100 feet right of centerline A CAT D-8 dozer was used to rip the subgrade <br />surface to a depth of 6" to 8". The subgrade was then moisture conditioned using a CAT 773 <br />water tuck (when necessary) and compacted using a 10-ton vibratory smooth drum compactor. <br />The entire surface of the subgrade was compacted with at least 4-passes. These areas were <br />inspected by an AMEC representative and accepted for structural fill placement. <br />VLF Weekly Report WE 09.12.09.D.doc