ame <br />Earth & Environmental <br />Location This Week <br />(tons) Cumulative <br />(tons) Comments <br />LOB Plant (Dump 5) 3,001 23,600 No SLF processing this week. <br />Totals 3,001 23,600 No change this week. <br />G. Miscellaneous <br />Ames continued work on the 9775 VLF bench widening on the existing Phase IV VLF for <br />the planned relocation of the existing solution lines. By the end of the week the widening <br />advanced to STA. G2+00(+/-). <br />II. Underground Working <br />A. Drilling <br />No work performed this week. <br />B. Mine Shaft/Stope Remediation <br />3001 52251.48 37816.28 9736.9 shaft-VLF <br /> sediment <br /> pond <br />3002 50199.46 40213.67 10174.95 shaft SE <br /> of VLF <br />3003 49681.86 39111.85 10222.51 shaft SE <br /> of VLF <br />3004 51832.11 38288.17 9758.465 shaft east of <br /> Substation <br />#3004 has been partially filled with oversize rock this past week, per AMEC <br />recommendations. <br />C. Lateral/Slot Remediation <br />No work performed this week <br />III. Stormwater Management Structures <br />A. Control Structures <br />No work performed this week. <br />IV. VLF Geosynthetics <br />A. LLDPE Geomembrane 80 mil and 100 mil <br />Lone Star (Installer): Submittal pending approval. Additional information required for <br />approval <br />Sheet 3 of 9 <br />VLF Weekly Report WE 03.21.09.D