My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (174)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (174)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
12/23/2010 1:27:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. II, Appendix D, Weekly Reports, Part 2.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame <br />Earth & Environmental <br />2. Sediment Collection Pond <br />Stripping has been completed. <br />C. Waste Rock to Stockpile: <br />1. VLF <br />All oversized material located in the fill from Stations K4+00 to 8+00 and 0 to 100 foot <br />left was pushed out of the fill area, stockpiled and has been removed to Joe Dandy haul <br />road. <br />2. Sediment Collection Pond <br />Excess rock from the pond excavation has been stockpiled for future removal and for <br />use in the mine remediation. <br />D. Cut to Fill <br />1. VLF <br />Continued placing structural fill intermittently during the week in the VLF from <br />approximate Sta. K6+00 to K9+00 approximately 0 to 75-feet left of centerline. Fill is <br />being hauled from the LOB Delivery Road cut areas and sediment pond excavation. <br />Benching each subsequent lift to remove any frozen or unsuitable material was <br />conducted using a Cat D-6 dozer while the fill progresses. All fill placed as per method <br />specification outlined in the Project Specifications. Fill temperature checks were <br />performed during the day and night shifts for project compliance. <br />2. Sediment Collection Pond: <br />Night Work: Excavation continued during the week and was basically complete by <br />mid week. Cut material was placed between VLF Station K6+00 to K9+00, 0 to 75- <br />feet left. All oversize rock was stockpiled for future fill material at the Joe Dandy haul <br />road and for use as mine shaft backfill in the VLF. <br />E. Subgrade Preparation <br />1. VLF <br />No work performed this week <br />2. Sediment Collection Pond <br />No work performed this week. <br />F. SLF Processing (Material is being generated/processed for the LOB and the VLF) <br />There was no production of the SLF material located in Dump 5 this past week. A new <br />plant is due to arrive sometime next week. <br />The materials screening plant located at the "Arequa Process Area" northwest of Ames <br />maintenance area for processing construction materials has not been operating this past <br />week. . <br />Sheet 2 of 9 <br />VLF Weekly Report WE 03.21.09.D
The URL can be used to link to this page
Your browser does not support the video tag.