My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (125)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (125)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
12/23/2010 12:56:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. II, Appendix D, Weekly Reports, Part 1
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />Earth & Environmental <br />• No Activities. <br />2. Sediment Collection Pond <br />• No Activities <br />C. Waste Rock to Stockpile <br />1. VLF <br />• No Activities <br />2. Sediment Collection Pond <br />• No Activities <br />D. Cut to Fill <br />1. VLF <br />• Ames started placement of structural fill on Friday 20 along the existing haul <br />road between the 5-point intersection and the crusher maintenance area. The fill <br />placement was to grade the road for drainage away from the sediment retention <br />basin located to the South and direct any run-off toward the retention basin <br />South of the crusher, North of the existing haul road. <br />• Amec discussed with Ames that the adjacent areas along the fill will require <br />over excavation of uncontrolled materials, frozen ground and sediment within <br />any retention drainages and completion of key-ins when the fill is extended to <br />adjacent areas. <br />• Structural fill placement along the existing haul road section is anticipated to <br />continue next week. <br />2. Sediment Collection Pond <br />• No Activities <br />E. Subgrade Preparation <br />1. VLF <br />• No Activities <br />2. Sediment Collection Pond <br />• No Activities <br />F. SLF Processing (Material is being generated/processed for the LOB and the VLF) <br />• Production of the SLF material continued intermittently at the Dump 5 clay <br />processing plant during the week. Continued maintenance problems resulted in <br />reduced production for the week. <br />• Ames continued setup of a second screening plant in the VLF to process other <br />construction materials. The second plant is identified as the VLF Materials <br />Processing Plant. Setup was not completed by the end of the week. This plant <br />will not be used to process SLF. <br />Sheet 2 of 8 VLF Weekly Report WE 02.21.09
The URL can be used to link to this page
Your browser does not support the video tag.