Laserfiche WebLink
ame <br />Earth & Environmental <br />Summary of SLF processing <br />II. Underground Working <br />A. Drilling <br />• RockBreakers continued drilling within the sediment collection pond area. Drilling was <br />intermittent at the beginning of the week but improved by the end of the week. By the <br />end of the week, the drillers were able to improve production. <br />Drilling Summary <br />B. Mine Shaft/Stope Remediation <br />• No Activities <br />C. Lateral/Slot Remediation <br />• No Activities <br />III. Stormwater Management Structures <br />A. Control Structures <br />• No Activities <br />IV. VLF Geosynthetics <br />A. LLDPE Geomembrane <br />• No Activities <br />Sheet 3 of 8 VLF Weekly Report WE 02.21.09 <br />Location This Week <br />(tons) Cumulative <br />(tons) Comments <br />Dump <br />5 Clay <br />Plant 11,800 14,300 Thru 23 obtained from Ames <br />` <br />Totals G. Miscellaneous <br />Activities <br />1. <br />No <br /> Current Week Cumulative <br />Location Holes Feet Holes Feet Comments <br /> Drilled Drilled <br /> ea ea <br />Sediment 5750 10,450 Thru 23rd footage obtained from Ames <br />Collection Pond <br />Totals