Laserfiche WebLink
Page 3 <br />¦ Please reference a map for the Apache Airshafts in the table <br />Please review Table 19 and the three sheets of Map 11 to ensure consistent and <br />accurate identification of all facilities, utilities, ponds, structures, etc. When <br />these amps are finalized, pursuant to Rule 2.10.3(2), please provide three <br />copies of Map 11, sheets 1-3, which have been signed and certified by a <br />registered, professional engineer. <br />NECC Response: Table 19 has been updated and modified to better describe the <br />facilities. The table is split into map headings with subsections by facility category. <br />Items in Table 19 are included on Map 11 New Elk Mine Site Plan -East Portal <br />Sheets 1-3, Map 12 Surface Facilities and Roads -West Portal, Map 13 <br />Sediment and Surface Water Control Plan-East Portal, Map 14 Sediment and <br />Surface Water Control Plan-West Portal and Map 3C -New Elk Mine Slope <br />Bottom Area Apache Seam. Facility categories include facilities constructed <br />prior to August 3, 1977, post law facilities constructed after August 3, 1977, <br />removed, Phase 1 released, permanent. The map labels have been matched with <br />Table 19. The maps are signed and certified by a professional engineer. Three <br />copies of revised Table 19 (pages 2.05-6 and 6a), three copies of each of Map 11 and <br />three copies of Map 12 are included with this letter. <br />Please note that the title for Map 11 New Elk Mine Site Plan East Portal - <br />Utilities has been changed to reflect the coverage of ponds in Map 13 Sediment <br />and Surface Water Control Plan - East Portal. <br />6. One water tank appears to have been added to Table 19 but two are discussed in <br />the cover letter. Please ensure that Table 19 clearly identifies each water tank by <br />size or volume. <br />NECC Response: Permit text on page 2.05-5a and Table 19 have been revised. <br />DRMS Response: Response accepted. However, there is a text error on revised <br />permit page 2.05-5a. The last sentence in the third full paragraph (paragraph <br />beginning "A ditch is proposed to route...") reads "The detailed design in included <br />as an addendum..." The word "in" should be "is", so the sentence will read "The <br />detailed design is included as an addendum..." Please correct the text in the final <br />sentence of the third full paragraph on revised permit page 2.05-5a, changing <br />the word "in" to "is", as noted above. Please submit three copies of revised <br />page 2.05-5a for review. <br />NECC Response. Page 2.05-5a has been modified as requested. Three copies are <br />included with this letter.