My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-10_REVISION - M1992066
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992066
>
2010-12-10_REVISION - M1992066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:11:55 PM
Creation date
12/13/2010 10:32:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992066
IBM Index Class Name
REVISION
Doc Date
12/10/2010
Doc Name
112c amendment application AM-02
From
Duckels Construction, Inc.
To
DRMS
Type & Sequence
AM2
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(b) A comparison of the proposed post-mining land use to other land uses <br />is in the vicinity and to adopted State and local land use programs. Where the <br />post mining land use is for commercial purposes, appropriate evidence <br />supporting such reasonable assurance shall be submitted, it not, a plan for <br />revegetation shall be submitted: <br />This site is located in an area with various uses to include rangeland, agricultural <br />(pasture) and some areas of residential/commercial. The proposed post mining <br />land use will be pond for wildlife use, and possible home sites. The Hogue Ranch <br />home site is located immediately west of the proposed expansion area. It is <br />located more than 200 ft. from the proposed affected area. <br />(c) A description of how the Reclamation Plan will be implemented to <br />meet each applicable requirement of Section 3.1: <br />3.1.2 Reclaiming Substituted Land: <br />The Applicant/Operator does not intend to substitute other land for reclamation <br />3.1.3 Time Limit and Phased Reclamation: <br />The expansion area will have one phase. This phase will require 4.6 to 9.2 years <br />of complete, depending on market demand. Upon completion of mining, the final <br />slopes will be mined at 3H:1 V or flatter, dependent on the location of wetland as <br />shown on the Reclamation Map. Creation of the wetlands will be the most <br />significant aspect of site regrading. This phase will require 2 to 3 months to <br />complete, followed by topsoil replacement, seeding and mulching. <br />Final reclamation will be completed within the five year time limit. <br />3.1.4 Public use: <br />The mine site is private land. The HRLP has no intent to allow public use of the <br />land either during mining or site reclamation. <br />3.1.5 Reclamation Measures - Materials Handling: <br />Reject material and excess overburden, as needed, will be hauled to the Bettger <br />Pit during back filling of cuts in order to achieve approximate original contour <br />(AOC). <br />Waste material generated from the crushing, screening and washing operations <br />will either be hauled to the Bettger Pit for backfill or stored within the pit to be <br />used for reclaiming wetlands. (See the Reclamation Plan Map and Figure A) <br />14
The URL can be used to link to this page
Your browser does not support the video tag.