Laserfiche WebLink
9. Please include cross-sections through the cut and fill area. If this cut <br />material is to be used for the Highway 12 alterations, describe how <br />the area proposed for disturbance will be returned to approximate <br />original contour. Also include maps and cross sections for this area <br />in the reclamation plan portion of the permit showing pre-mine and <br />post-mine contours. <br />NECC Response: Cross-sections are provided on Map 11 and Figure <br />14, page 2.05-46a. No material will be used for Highway 12 <br />alterations. <br />DBMS Response: Response accepted. <br />10. Map 11 is noted as in transition as updated survey control is added <br />and new structures are added Please refer to Rule 1120 in particular <br />to the phrase legibly detail Currently Map 11 includes information at <br />a scale and or font that cannot be discerned Please refine this <br />important map to provide legible detail of all information being <br />presented. <br />NECC Response: Map 11 has been modified and improved. <br />DBMS Response: Response accepted, with the exceptions as noted <br />in this letter. <br />11. Please update Figure 2d on page 2.05-10b to indicate how surface <br />runoff will be routed to the ditch system shown on Map 13 of the <br />approved permit. <br />12. Page EX. 28-153, bond calculations, indicates 651 cubic yards of <br />topsoil will be removed from the area proposed for disturbance under <br />TR-54. The application form indicates a request to disturb.55 acres. <br />Although no map clearly shows the current disturbance and the <br />boundary of the proposed new disturbance, The Division estimates <br />that the new disturbance will result in an additional 1.3 acres of <br />disturbance, based on Map 15, Surface Disturbance. The information <br />as it currently exists does not provide enough detail on the area to be <br />disturbed, the amount of topsoil present, the type of topsoil, stripping <br />depths, presence of subsoil, removal, storage, and redistribution <br />depths. Please review pages 2.04-33 to 42 of the approved permit <br />application and add permit text narrative on page 2.05-46, provide <br />an updated Map 15 showing the new disturbance, and modify the <br />bond calculation pages as necessary.